Advice on acceptable approach to credit achievement for IEQc5
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Shelley Duan on
Is a covered exterior grate system (e.g, outside a vestibule) at all high volume entryways an acceptable approach to credit achievement for IEQc5? Any advice or guidance would be most appreciated.
Requirements
CS-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Guillermo Hernandez Espinoza on
This may seem to be a silly question, but is causing me lots of issues, is there any kind of requirement to achieve this credit other than just an all or nothing?
Target Finder
NC-2009 EAp2:Minimum energy performanceposted by TEY SIUNG on
We are building a Hotel in Doha, Qatar. We are try to apply for LEED certified. While I start , I meet a Target Finder problem. This Target Finder only design for US climate.
EAp2 - Compliance to ASHRAE standards
CI-2009 EAp2:Minimum energy performanceposted by Paolo Losi on
Hi all, we are willing to pursue LEED CI certification for our office in Italy.
Definition of hard-lid ceiling?
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Renee Shirey on
I have a situation where I cannot eliminate a sloped acoustic ceiling with a gyp ceiling, and the walls do not go up to the deck (they go to the underside of trusses).
Base building EBOM credits denied
CI-2009 IDc1:Innovation in designposted by Raphael Sperry on
I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the base building provides Green Cleaning, Integrated Pest Management, and a Zero-Waste Plan to
Open Space and LEED Project Boundary
CS-2009 SSc5.1:Site development - protect or restore habitatposted by Sara Neff on
If there are city/state/federal restrictions on development such that development in certain areas is prohibited by law, can I include those areas in the LEED project boundary?
Sealants and gaskets
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by ruffina thilakaratne on
we are using polyurethane and silicone sealants and gaskets in fire barriers and glazing works. which LEED standards should I refer to? is VOC a concern? thanks
Commissioning innovation point
CS-2009 EAc3:Enhanced commissioningposted by Magnus Stagnäs on
The reference guide states that CS projects requiring both fundamental and enhanced commissioning for all tenant spaces may be considered for an innovation point.
Interpretation doubt
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by Carolina Vergnano on
Hello, I've got a doubt about the time that we should develop the breakdown of energy.