Forum quick links
EBOM IEQp1: Dedicated OA to classroom FCU's
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by James Doyle on
For EBOM IEQp1 we have a school using a dedicated ventilation AHU providing ventilation air to classroom FCU's.
Cooling Tower for Back-up Diesel Generators (DG)
EBOM-2009 WEc4:Cooling tower water managementposted by Anshul Chawla on
The project site has 3 cooling towers of 215 ton capacity each. These cooling towers serve the HVAC system of the building and are operational for 8-10 hrs on all working days.
VRP Compliance Calculator
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Juliana Malho on
We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.
Technical Rooms
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Juliana Malho on
Does technical rooms, as IDFs rooms needs to have outside air renovation?
Advice on acceptable approach to credit achievement for IEQc5
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Shelley Duan on
Is a covered exterior grate system (e.g, outside a vestibule) at all high volume entryways an acceptable approach to credit achievement for IEQc5? Any advice or guidance would be most appreciated.
Requirements
CS-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Guillermo Hernandez Espinoza on
This may seem to be a silly question, but is causing me lots of issues, is there any kind of requirement to achieve this credit other than just an all or nothing?
Target Finder
NC-2009 EAp2:Minimum energy performanceposted by TEY SIUNG on
We are building a Hotel in Doha, Qatar. We are try to apply for LEED certified. While I start , I meet a Target Finder problem. This Target Finder only design for US climate.
EAp2 - Compliance to ASHRAE standards
CI-2009 EAp2:Minimum energy performanceposted by Paolo Losi on
Hi all, we are willing to pursue LEED CI certification for our office in Italy.
Definition of hard-lid ceiling?
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Renee Shirey on
I have a situation where I cannot eliminate a sloped acoustic ceiling with a gyp ceiling, and the walls do not go up to the deck (they go to the underside of trusses).
Base building EBOM credits denied
CI-2009 IDc1:Innovation in designposted by Raphael Sperry on
I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the base building provides Green Cleaning, Integrated Pest Management, and a Zero-Waste Plan to