Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Renovated parking for another entity - part of parking total?

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Renee Shirey  on 

We have a project where we are accessing our site by cutting through an existing parking lot that belongs to the city (and supports the use of a city-owned pool).

1
Mon Dec 19, 2011, 4:43 am

Future Contract for SSc5

EBOM-2009 SSc5:Site development - protect or restore open habitat
posted by  Frederick Freeman  on 

We are currently pursuing EBOM for a small campus of buildings and are interested in the off-site option and our company owns a large plot of land that will be redeveloped into a new building with

1
Sun Dec 18, 2011, 3:50 am

How to model chiller for only one wing of an existing building

NC-2009 EAc1:Optimize energy performance
posted by  Allison McSherry  on 

I am currently working on a LEED v3.0 model in trace 700. It is a historic building originally built in the late 1800s. It has a variety of unique situations that I am unsure of how to model.

1
Tue Dec 20, 2011, 2:43 pm

Open space below the building

NC-2009 SSc5.2:Site development - maximize open space
posted by  Ramón Gutiérrez  on 

Hello from Spain, Our ground floor is smaller than our building footprint.

1
Fri Feb 17, 2012, 10:59 pm

CEE Tier III ratings in washers

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Chris Miller  on 

The Consortium for Energy Efficiency (CEE) updated their list of models that are compliant for the varioius CEE Tier ratings. The website had great information on other appliances too.

1
Mon Jul 25, 2016, 1:54 pm

Building Footprint

CS-2009 SSc5.1:Site development - protect or restore habitat
posted by  Ana Paula Liptak Constancio  on 

Hi all, I have doubts about the definition of nonbuilding facilities (when it said ‘Parking lots, landscapes, and other nonbuilding facilities are not included in the building footprint’). My pr

1
Tue Dec 20, 2011, 6:15 pm

Energy Requirements - Looking Ahead to EBOM 2012

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Prudence Ferreira  on 

We are working on a retail/catering facility that we cannot currently certify as NC because the addition we are doing is not large enough to qualify.

1
Thu Jan 5, 2012, 2:16 pm

converting VOC content

CS-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Adi Negara, LEED AP BD+C  on 

Hi I receive several MSDS for the coatings that will be used in our project and inside them, the VOC content is measured in Europe (EU) which are usually expressed in percentage % (w/w).

1
Wed Feb 22, 2012, 2:55 am

About the 1/4 mile distance

CS-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Guillermo Hernandez Espinoza  on 

Our project has access to 2 bus stops, 1 located just outside of the building's perimeter with 2 bus lines and the other one is the main one, whit main it means that's the one the 90% of the people

1
Fri Sep 14, 2012, 9:08 pm

I'm working on finalizing

CI-2009 EAc1.1:Optimize energy performance - lighting power
posted by  Heather Anderson  on 

I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings.

1
Thu Dec 22, 2011, 12:17 am