Forum quick links
LEED boundary and Major Additions
NC-2009 EAp2:Minimum energy performanceposted by Len Sciarra on
A new project, under LEED-NC, is a major addition to an existing building, in this case a manufacturing facility which will result in basically three sections New Office, Existing Office, and Exist
Sealant for Windows and Doors
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Adi Negara, LEED AP BD+C on
For this kind of sealant, can I just put it under Architectural Sealant?
Furniture Value
CI-2009 MRc4:Recycled contentposted by severine secret on
When documenting the furniture value of an order for credits MRc4 thru Mrc7, do we include local tax, installation and freight on the total order?
Wood and recycle content
CI-2009 MRc4:Recycled contentposted by severine secret on
Is reclaimed wood considered recycled?
Health Club Facility
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Sara Neff on
Does anyone know what documentation we provide to prove that .5% of the FTE of a project have access to the showers in a nearby health club facility? Signed statement on letterhead?
Pool Cover and Air souce heat pump
NC-2009 EAp2:Minimum energy performanceposted by Arub Vijay on
Can the mandatory requirement of swimming pool cover be exempted if an air-souce heat pump is used for pool heating? The pool is heated to 30 ºC, is the pool cover mandatory in this case.?
Particulate Matter Removal
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
Hi to all of you, as per Standard 62.1-2007, in Section 5.9, one of the minimum requirements for mechanically ventilated spaces, a MERV 6 filter shall be provided upstream of all cooling coils.
Radiant Heat Mats
CI-2009 EAp2:Minimum energy performanceposted by Holly Himes on
Has anyone used these on a project and which credit would then fall under if any?
Developing the plan post-construction
NC-2009 EAc5:Measurement and verificationposted by Maura Adams on
Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?
Bypaas VAVs and AHUs
CI-2009 EAc1.3:Optimize energy performance - HVACposted by monu goyal on
Hello to all, my query is our project is two floors in a 9 floor building. The base building developer has provided AHUs and chilled water supply.