Roof Area definition
EBOM-2009 SSc7.2:Heat island effect - roofposted by David Tompos on
The definition for roof area indicates that only the roof area directly above the Gross Square Footage should be used for the Option 1 - 75% calculation.
Space types included in IEQ 4 credits ?
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Timo Rintala on
Hi My questions conserns calculation of VOC:s from technical & garage spaces.
Counting FTE from future developments?
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Anne-Maria Vierinen on
We have a master plan campus project for which we are trying to acheive several credits which, once achieved, can then be easily shared and applied for in the 3 individual projects which will event
Electric Cigarettes
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Andreas M. Roessler on
Dear all, one of our major clients set an interesting question concerning electronic cigarettes.
Base model minimum efficiencies
NC-2009 EAc1:Optimize energy performanceposted by Ming Feng on
Hi, I have a question about baseline building HVAC minimum efficiency.
90.1-2007 Table G3.1.1A for Additions and Alterations
NC-2009 EAp2:Minimum energy performanceposted by Evelyn Dicks, EI, CxA on
Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?
Furniture Used from Previous Location in New Site
CI-2009 MRc4:Recycled contentposted by Michelle Bracewell-Musson on
First of all, I LOVE this site as it is so helpful and has saved me so much time! THE ISSUES I have documented the reused furniture in MR c3.2 Materials Reuse - Furniture and Furnishings and I know
ABSL-3 Baseline vs. Proposed Fan Energy for RTU
NC-2009 EAc1:Optimize energy performanceposted by Michael O'Brien on
I've recently come across a deblitating problem as it pertains to the energy modeling of an ABSL-3 space.
IAQ Concerns due to LEED boundary
CI-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Kunjan Shah on
My project is inside a 3 story building. The remodel work spans all 3 floors and City permit drawings show work all over the building and building shell.
CIR for process condition that allows exclusion of space?
NC-2009 IEQc7.1:Thermal comfort - designposted by CRB Sustainability on
Hi, For a building that has a specific requirements for manufacturing areas to be at temperature/humidity setpoints that fall outside of ASHRAE 55-2004 is there a CIR that anyone else has found th