Forum quick links
Rainwater Harvesting
NC-2009 SSc6.2:Stormwater design - quality controlposted by Udana Ratnayake on
Our project is harvesting and reusing rainwater for flushing. rainwater that falls on the roof is collected in a 10cubic meter sump.
Completing Enhanced Cx Templates for Federal Projects
NC-2009 EAc3:Enhanced commissioningposted by Hsin-Yi Hsieh on
Many federal projects are design/build (DB) where the DB firm hires the Commissioning Authority (CxA).
Clarification needed on "New" vs "Old"
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Monika Mickute on
Hi, We moved into a new building (CAD production, Document management, and large scale plotting business), which we are certifying under LEED CI.
Audit reccommendation to turn off zone
EBOM-2009 WEc3:Water efficient landscapingposted by SIG - Sustainability Main Account on
We performed a full audit of the irrigation system and some of the findings were to turn off zones that are watering established plants or mulch areas.
Super 8 Motel - comply with 10 units per acre
NC-2009 SSc2:Development density and community connectivityposted by Thomas Boyd on
Can a super 8 motel be used as a residence documenting 10 units per acre if the operator is leasing rooms on month to month basis?
EPP certification for proof of recycled content?
NC-2009 MRc4:Recycled contentposted by Renee Shirey on
Has anybody ever had an issue with using an EPP certified product to gain recycled content for a project?
Exemplary Performance
NC-2009 MRc7:Certified woodposted by J Morrison on
Have been having difficulty uploading documents for this credit. I called the 800 number and they said that they were having technical difficulties and to try again later.
Fluid Applied Air Barriers
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nilo Regojo on
We are a General Contractor working on a school project and the specs require submittal of product data for the air barrier as part of IEQc4.2.
No new parking except for 3 LE/FE spaces
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Nelina Loiselle on
I'm working on a campus building where we have added only 6 new spaces (3 of which are ADA) I understand the ADA can be exempted, but since the other 3 new ones are being added to be reserved for L
Having Trouble Getting Compliance for EAp2
NC-2009 EAp2:Minimum energy performanceposted by Brian ORourke on
I am working on a LEED project and we hired an engineer to run an energy model on EQuest.