Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Post-certification - Does MRc3 apply to new tenants?

EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additions
posted by  Stacey Olson  on 

We have a signed lease to proceed with a tenant imrovement in a multi-occupant EBOM Gold buidling.

1
Thu Jan 26, 2012, 5:59 pm

GWP / ODP of Water & Lithium Bromide

NC-2009 EAc4:Enhanced refrigerant management
posted by  Jens Apel  on 

In our project a absorption chiller will be used to cover part of the cooling load. The chiller will run on lithium bromide / water solution.

1
Sun Feb 19, 2012, 1:52 pm

Division 12 included

CI-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Jennifer Berthelot-Jelovic  on 

I don't have my LEED Reference Guide with me. I am working on a Lab. There is millwork included in Division 12 for the Casework.

1
Mon Mar 12, 2012, 8:31 pm

Roof Area definition

EBOM-2009 SSc7.2:Heat island effect - roof
posted by  David Tompos  on 

The definition for roof area indicates that only the roof area directly above the Gross Square Footage should be used for the Option 1 - 75% calculation.

1
Tue Feb 21, 2012, 4:35 pm

Space types included in IEQ 4 credits ?

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Timo Rintala  on 

Hi My questions conserns calculation of VOC:s from technical & garage spaces.

1
Wed Feb 1, 2012, 11:59 pm

Counting FTE from future developments?

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Anne-Maria Vierinen  on 

We have a master plan campus project for which we are trying to acheive several credits which, once achieved, can then be easily shared and applied for in the 3 individual projects which will event

1
Mon Feb 6, 2012, 2:41 pm

Electric Cigarettes

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Andreas M. Roessler  on 

Dear all, one of our major clients set an interesting question concerning electronic cigarettes.

1
Sat Feb 18, 2012, 3:20 am

Base model minimum efficiencies

NC-2009 EAc1:Optimize energy performance
posted by  Ming Feng  on 

Hi, I have a question about baseline building HVAC minimum efficiency.

1
Tue Jan 31, 2012, 7:57 pm

90.1-2007 Table G3.1.1A for Additions and Alterations

NC-2009 EAp2:Minimum energy performance
posted by  Evelyn Dicks, EI, CxA  on 

Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?

1
Tue Jan 31, 2012, 10:30 pm

Furniture Used from Previous Location in New Site

CI-2009 MRc4:Recycled content
posted by  Michelle Bracewell-Musson  on 

First of all, I LOVE this site as it is so helpful and has saved me so much time! THE ISSUES I have documented the reused furniture in MR c3.2 Materials Reuse - Furniture and Furnishings and I know

1
Sat Feb 4, 2012, 2:07 pm