Forum quick links
Post-certification - Does MRc3 apply to new tenants?
EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additionsposted by Stacey Olson on
We have a signed lease to proceed with a tenant imrovement in a multi-occupant EBOM Gold buidling.
GWP / ODP of Water & Lithium Bromide
NC-2009 EAc4:Enhanced refrigerant managementposted by Jens Apel on
In our project a absorption chiller will be used to cover part of the cooling load. The chiller will run on lithium bromide / water solution.
Division 12 included
CI-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Jennifer Berthelot-Jelovic on
I don't have my LEED Reference Guide with me. I am working on a Lab. There is millwork included in Division 12 for the Casework.
Roof Area definition
EBOM-2009 SSc7.2:Heat island effect - roofposted by David Tompos on
The definition for roof area indicates that only the roof area directly above the Gross Square Footage should be used for the Option 1 - 75% calculation.
Space types included in IEQ 4 credits ?
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Timo Rintala on
Hi My questions conserns calculation of VOC:s from technical & garage spaces.
Counting FTE from future developments?
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Anne-Maria Vierinen on
We have a master plan campus project for which we are trying to acheive several credits which, once achieved, can then be easily shared and applied for in the 3 individual projects which will event
Electric Cigarettes
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Andreas M. Roessler on
Dear all, one of our major clients set an interesting question concerning electronic cigarettes.
Base model minimum efficiencies
NC-2009 EAc1:Optimize energy performanceposted by Ming Feng on
Hi, I have a question about baseline building HVAC minimum efficiency.
90.1-2007 Table G3.1.1A for Additions and Alterations
NC-2009 EAp2:Minimum energy performanceposted by Evelyn Dicks, EI, CxA on
Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?
Furniture Used from Previous Location in New Site
CI-2009 MRc4:Recycled contentposted by Michelle Bracewell-Musson on
First of all, I LOVE this site as it is so helpful and has saved me so much time! THE ISSUES I have documented the reused furniture in MR c3.2 Materials Reuse - Furniture and Furnishings and I know