Forum quick links
Commissioning existing energy systes
CS-2009 EAp1:Fundamental commissioning of building energy systemsposted by Ken Dooley on
We have building renovation that is refurbishing 80% of a building aiming for CS 2009.
Achieving IEQp1 with no ventilation systems for C&S project
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Tony Schafer on
I’m wondering about how to comply with this credit for a C&S building that, upon initial completion, will be just a big warehouse space with no ventilation and the only HVAC equipment will be u
Retail Space inside a Shopping Center
CI-2009 SSc3.3:Alternative transportation - parking availabilityposted by Sustentator Argentina on
We are looking to certify a retail space inside a huge shopping center under Commercial Interiors (not as Retail Commercial Interior, the shopping is NOT certified) We are considering that our shop
facade lighting savings
CS-2009 EAc1:Optimize energy performanceposted by Puteri Shireen Jahnkassim on
Dear Marcus We conducted an energy simulation analysis and included Facade lighting as one of the energy saving features.
Private or Public Restrooms?
CS-2009 WEp1:Water use reductionposted by Alejandro Vega on
I'm working in a LEED CS Warehouse:non-refrigerant building, the project is divided in 2 main areas: office and warehouse.
EAp2 Required Signatories
NC-2009 EAp2:Minimum energy performanceposted by Bob Korp on
Two project engineers have completed the sign-off task, but a 3rd has been unable to use LEED ON-LINE despite my efforts to provide remote assistance.
Square Footage Discrepancy
Schools-2009 EAp2:Minimum energy performanceposted by Michael Kros on
Our mechanical engneer/energy modeler just contacted me to ask about a discrepancy in our square footages from what we have entered on PIf2 on LEED Online, and what he has input in the energy model
MR3 or MR1.2?
CI-2009 MRc3.1:Materials reuseposted by Kenny Grossman on
I've got a project where nearly nothing has changed between tenants.
How do I find replacement lights?
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by Michael Smithing on
I've been provided with a light inventory for our building and so know what type of light I'm looking for (e.g. 18W F840). I've also found the Philips, GE and Sylvania LEED-EB calculators.
Treatment plant startup
CS-2009 WEc2:Innovative wastewater technologiesposted by Gabriela Hernández Castillo on
Due to the nature of a treatment plant it requires the building to be operating before the treatment plant is functional. Is there any requirement for a maximum of time before the treatment plant