Forum quick links
Parking Lot Coatings
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Charles Fritzemeier on
Where do parking lot coatings come in?
No Green-e certification available
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Sustainability Provider on
Hello, Our building is pursuing for LEED EBOM 2009 vertification and we procure all of our electricity (no natural gas or other fuel type is consumed in our building) from a renewable energy provid
MERV Filter Replacement
CI-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Sheela I on
Prior to demo/During construction we have installed MERV 8 on the return air units. But after construction the replacement of the filters is managed by the building management.
USDA Organic Seeds
EBOM-2009 MRc5:Sustainable purchasing - foodposted by David Tompos on
The company I work for is in the process of applying for certification, and I have a question regarding whether Organic seeds may be counted towards the sustainable purchases: food, credit.
Bathroom within a hotel room
NC-2009 IEQc8.2:Daylight and views - viewsposted by Mark McTeer on
In general public bathrooms do not count as regularly occupied space, but what about bathroom inside a hotel room or suite? Hotel lobby?
Blower Door Test in NC?
NC-2009 EAc1:Optimize energy performanceposted by Ian Johnson on
I'm working on a renovation of an existing building pursuing LEED NC. The clients would like to perform a blower door test prior to drywall installation to improve the building's thermal envelope.
Lighting Power Allowance
NC-2009 EAp2:Minimum energy performanceposted by David Weigel, PE on
I am working on a new facility that is mixed-use health care, research laboratory, and conference center. Computing lighting power density by either space-by-space or whole-building method yields
Project can't meet Outside Air Requirements
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Rob Hink on
We have a project which the outdoor air supply is limited from the base building HVAC system (out of our boundary) and we are not sure if the project will be able to meet the ASHRAE 62.1 requiremen
Walkable Streets - Historic
Pilot-Credits PC14:Walkable Streetsposted by Pat Thomas on
Our project is an adaptive reuse of a historic building in a historic district.
Group Certification and Meters
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by JOHN COOK on
We have a situation where we would like to utilize the multiple building approach as a group project for 2 buildings and the surrounding site.