Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Two Stage CI LEED Assessment?

CI-2009 MRc2:Construction waste management
posted by  Chris Hocknell  on 

Dear all, I am submitting a Two Stage LEED Assessment and I am not sure how to deal with credits such as The Site Waste Management Plan.

1
Thu Jun 21, 2012, 4:56 pm

Central Plant Equipment Under scope of credit?

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Janene Bolt  on 

We are looking into this credit for a restoration project at a Navy Yard.

0

0.125 gpf (1 pint) urinals: scale & pipe maintenance problems?

NC-2009 WEp1:Water use reduction
posted by  Andrew Tse  on 

All urinals require maintenance and all urinals have scale buildup. With reduction of flow rates the potential for drain line scale build-up and pipe corrosion is increased.

1
Fri Apr 6, 2012, 4:22 pm

EAp2 option 2 vs EAc1 Option 3

NC-2009 EAc1:Optimize energy performance
posted by  Carl Sherman  on 

If we use option 2 for EAp2 can we use option 3 for EAc1 or do we need to be consistant throughout?

1
Wed Apr 4, 2012, 7:51 pm

Water Flow Diagram

Pilot-Credits PC25:Water Metering and Reporting
posted by  Donald Bauman  on 

This comment relates to Project ID: 1000012468 and try to comply with Pilot Credit 25 - Water Metering: •The credit requires us to submit a water flow diagram indicating all sources and uses of wa

1
Thu Apr 5, 2012, 4:48 pm

backup energy source

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD

1
Fri Apr 6, 2012, 6:32 pm

Green Cleaning

NC-2009 IDc1:Innovation in design
posted by  Lauren Ford  on 

We have a hotel project in Virginia and are wondering if anyone has successfully used the Virginia Department of Environmental Quality's "Virginia Green Lodging Facility" requirements as a baseline

0

What to do when electricity produces less carbon than gas?

NC-2009 EAc1:Optimize energy performance
posted by  Raphael Sperry   on 

Hello all, I'm working on a project for an owner who operates their own hydropower dam. It's an older facility and it the electricity it produces registers as basically carbon neutral.

0

Is it possible to achieve this credit through plant troughs?

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Keerthi Ratnayake  on 

Dear All, We are currently working on a five storey office building and instead of going to a vegetated roof we are planning to have plant troughs all around the building in every level.

1
Mon Apr 9, 2012, 12:20 pm

Pre-Engineered Wood Trusses?

NC-2009 MRc7:Certified wood
posted by  Kory Beighle  on 

When the credit states that..."These components include at a minimum, structural framing and general dimensional framing, flooring, sub-flooring, wood doors and finishes." Does this include pre-eng

1
Mon Apr 9, 2012, 3:36 pm