Alternative compliance path: Core & shell 2009 EAp2

CS-2009 EAp2:Minimum energy performance
posted by  TOMAS URIBE  on 

I am working on a Core and Shell Project and I would like to use the calculator of alternative compliance path for reducing the percentage of saving needed to meet EA the prerequisite 2.

1
Tue May 29, 2012, 12:47 pm

Are “default values” and “estimated values” the same thing?

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Patrick Culhane  on 

Our office building has data center space which is submetered but before the UPS rather than after.

0

secondary use of well water

EBOM-2009 WEc2:Additional indoor plumbing fixture and fitting efficiency
posted by  Noriko Nagazumi  on 

Our project will use well water for HVAC/ ooling tower first then reuse it for flush of water closet. We assume it can be regarded as gray water even if it is derived from well first.

1
Mon Sep 3, 2012, 2:15 pm

Increased energy consumption by a single tenant

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Anna Korinkova  on 

Hi all! How to correctly input energy data (to ES Portfolio Manager) for an office building where a tenant (bank) has it's own chiller, consumes almost one third of the total building energy consum

1
Thu Aug 9, 2012, 3:06 pm

Non ES rated Oven project in europe

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Cyril Knabe-Nicol  on 

Hello everyone, I have a LEED CI in europe and i have an issue with an oven, it is non ES rated and the manufacturer do not have any information in btuh.

1
Tue Jun 26, 2012, 5:44 pm

No-smoking Signage provided as part of tenant package

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  S. Sachs  on 

Hi, I am working on a LEED CS project with a single tenant. The tenant has a no-smoking policy and is providing signage throughout the property and building.

1
Fri Mar 22, 2013, 4:29 am

Commissioning Agent Experience Template Form

CS-2009 EAp1:Fundamental commissioning of building energy systems
posted by  nalat yulong  on 

The commissioning agent for our project indicated there is a LEED template he has completed in the past documenting his experience as an agent on similar projects and detailing his certifications.

1
Thu May 31, 2012, 4:49 pm

Exterior Lighting special circumstances

CI-2009 EAc1.1:Optimize energy performance - lighting power
posted by  Luis Miguel Diazgranados  on 

Hello Everyone: First of all, I have read previous posts, and I have seen that this subject has already been discussed, but the way I see it, in this case it might be a special circumstance. We a

0

Different showers in Wellness / Fitness Center

CS-2009 WEp1:Water use reduction
posted by  Ralf Lehmann  on 

Within a typical fitness center including a sauna there are different types of showers. 1.

0

Standard flush fixtures automatically gives credit in my county

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Maria Porter  on 

I just wanted to hear thoughts about the fact that our standard flush fixtures reduce water usage by 56 %, without us doing anything.

1
Wed Feb 6, 2013, 9:55 am