Forum quick links
Trending Acceptable for Mins and Maxs?
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by AAME User on
Once the outside air has been read and the assumed potential critical zones have been identified, if a building owner/staff is unable to compile the mechancial as-builts in order to determine max (
Additional IAQ Testing for ID credit
NC-2009 IDc1:Innovation in designposted by Tiffany Moore on
Does anyone have recent experience using an ongoing IAQ testing process to monitor for VOCs and CO in addition to CO2 as an ID credit?
elastomeric coating
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Emmanuel Pauwels on
We are using an elastomeric coating that funtions as an adhesive for a plastic cover of a tube as well as an anti-humidity barrier. To which category would such an elastomeric coating belong?
Bicycle sharing for ID credit
CI-2009 IDc1:Innovation in designposted by Vickie Chen on
Dear all, Our client is a manufacturer of "electric bicycle" and they are thinking of introducing electical bicycle sharing programme for their retail project, or donating electical bicycles to the
Hospital Application
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Alexa Stone on
Could anyone shed some light as to how they might approach this PR with a hospital. There international restrictions on the use of aerators on facets, sinks etc because of pathogens.
exclusions
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Nate Maniktala on
Hi there, I was wondering if there are exclusions to some of the pieces of equiptment that would qualify as Energy Star?
LEED-CI Cx after occupancy?
CI-2009 EAp1:Fundamental commissioning of building energy systemsposted by Leticia SooHoo on
I am working on a proposal for a LEED-CI project.
Baseline Fan Power: Systems 6 and 8 ASHRAE 90.1-2007 Appendix G
NC-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
If our Baseline building design HVAC system is ASHRAE’s #6 or #8 (according to TABLE G3.1.1B).
Inert post-installation materials
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Andrew Gil on
I am remembering hearing of an addendum, errata or CIR, clarifying that materials that undergo a chemical reaction DURING installation (e.g.
Plastics/PVC and Flooring
EBOM-2009 MRc9:Solid waste management - facility alterations and additionsposted by Kim Wajda on
Neither are mentioned in the Solid Waste Conversion Factors table in the EB O&M manual so I calculated their conversions from pounds to cubic yards using the given density for "Mixed waste".