Salvaged granite block

NC-2009 MRc3:Materials reuse
posted by  Sara Sweeney  on 

Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.

1
Mon Jun 11, 2012, 4:12 pm

Private Lav Faucets - Baseline vs. Metered Design

CI-2009 WEp1:Water use reduction
posted by  Vincent Pieri  on 

We are working on a single floor, single tenant project with several fixture group assignments.

1
Wed Sep 5, 2012, 10:46 pm

multiple buildings energy modeling

NC-2009 EAp2:Minimum energy performance
posted by  Tarek Dalati  on 

My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly

1
Mon Jun 11, 2012, 1:22 pm

Refrigerators

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Rebecca Nelson  on 

I want to be able to supply to LEED certified buildings and customers. To apply towards a LEED credit, do refrigerators and refrigerator-freezers only need to meet EnergyStar requirements?

1
Fri Jun 22, 2012, 4:11 pm

New LEED CI SScr3

CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing rooms
posted by  Kevin Wilcox  on 

I recently completed a LEED CI project and submitting for review and just started a new LEED CI project under LEED CI v2009 and found a significant change to the SS credit 3 category.

1
Tue Jun 19, 2012, 11:08 pm

9.4.1.2 (Space Control)

NC-2009 EAp2:Minimum energy performance
posted by  Carolina Vergnano  on 

In the item 9.4.1.2 (Space Control) of ASHRAE 90.1-2007, it is not clear if the lights of the classrooms/conference/meeting/break rooms have to be controlled only by occupancy sensors controls.

1
Mon Jun 11, 2012, 7:29 pm

We are working on a stadium

NC-2009 EAp2:Minimum energy performance
posted by  Carolina Vergnano  on 

We are working on a stadium Project, where the item 9.4.1.1 (Automatic Lighting Shutoff) of ASHRAE 90.1-2007 is being complied for most of the areas, which represents more than 90% of the project a

1
Mon Jun 11, 2012, 7:46 pm

Acceptable Testing Evidence?

Pilot-Credits EApc8:Demand response
posted by  Terry Gorski  on 

What type of evidence of Demand Response testing being conducted would be acceptable to submit for a building that has 3rd party systems involved and does not receive any documentation of the actua

1
Mon Aug 6, 2012, 1:35 pm

Define "Weatherproofing System"

Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Steven Woods  on 

The roof on our building is constructed as follows: structural steel framing, metal roof deck, vapor barrier, rigid insulation, ventilated nail base insulation panel (a pre-fabricated unit of OSB o

1
Tue Jun 12, 2012, 2:22 pm

Exterior Renovation Project

EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additions
posted by  Edward Malesevich  on 

A project I am currently working on is undergoing an exterior renovation project.

1