Salvaged granite block
NC-2009 MRc3:Materials reuseposted by Sara Sweeney on
Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.
Private Lav Faucets - Baseline vs. Metered Design
CI-2009 WEp1:Water use reductionposted by Vincent Pieri on
We are working on a single floor, single tenant project with several fixture group assignments.
multiple buildings energy modeling
NC-2009 EAp2:Minimum energy performanceposted by Tarek Dalati on
My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly
Refrigerators
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Rebecca Nelson on
I want to be able to supply to LEED certified buildings and customers. To apply towards a LEED credit, do refrigerators and refrigerator-freezers only need to meet EnergyStar requirements?
New LEED CI SScr3
CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing roomsposted by Kevin Wilcox on
I recently completed a LEED CI project and submitting for review and just started a new LEED CI project under LEED CI v2009 and found a significant change to the SS credit 3 category.
9.4.1.2 (Space Control)
NC-2009 EAp2:Minimum energy performanceposted by Carolina Vergnano on
In the item 9.4.1.2 (Space Control) of ASHRAE 90.1-2007, it is not clear if the lights of the classrooms/conference/meeting/break rooms have to be controlled only by occupancy sensors controls.
We are working on a stadium
NC-2009 EAp2:Minimum energy performanceposted by Carolina Vergnano on
We are working on a stadium Project, where the item 9.4.1.1 (Automatic Lighting Shutoff) of ASHRAE 90.1-2007 is being complied for most of the areas, which represents more than 90% of the project a
Acceptable Testing Evidence?
Pilot-Credits EApc8:Demand responseposted by Terry Gorski on
What type of evidence of Demand Response testing being conducted would be acceptable to submit for a building that has 3rd party systems involved and does not receive any documentation of the actua
Define "Weatherproofing System"
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Steven Woods on
The roof on our building is constructed as follows: structural steel framing, metal roof deck, vapor barrier, rigid insulation, ventilated nail base insulation panel (a pre-fabricated unit of OSB o
Exterior Renovation Project
EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additionsposted by Edward Malesevich on
A project I am currently working on is undergoing an exterior renovation project.