Forum quick links
Survey done outside Performance Period
EBOM-2009 SSc4:Alternative commuting transportationposted by Derek Bernard on
The company in which we are the LEED consultant for conducts an annual survey regarding alternative transportation of its occupants....would a survey done outside the performance period be allowed
Thermal Comfort calculations - without simulation
CI-2009 IEQc7.1:Thermal comfort - designposted by Edwin Wealend on
Does anyone know of approved methods to prove this credit without completing a full energy model to simulate indoor conditions, in particular radiant heat? It seems a Psychrometric chart is no lon
Addition to existing building
Schools-2009 EAp2:Minimum energy performanceposted by mital patel on
We have a existing building that is LEED Silver and we are adding to same building. New addition is also LEED Silver. Do I need to model both existing and new addition or only new addition.
Sealants on Stone Art wall
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Jennifer Benedict on
We have a project where a large portion of the stone wall in the lobby will serve as an art installation (stone will be etched & then sealed).
Baseline System parameters with a DES
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Luke Knapp on
I'm designing a building on a college campus that has a DES. We opted to model option 1 for EAc1 (Building Stand-alone scenario).
Parking Capacity - Service/City Vehicles
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by MacKenzie King on
We are working on a city animal shelter that meets the zoning requirements for staff and guest parking on the site.
choosing multiple baseline systems in one building
NC-2009 EAp2:Minimum energy performanceposted by ESD Singapore on
Dear organisation, I have a question regarding choosing the correct baseline system. We are working on a Multipurpose building.
Irrigation of greenery out of LEED boundary
EBOM-2009 WEc3:Water efficient landscapingposted by Anna Korinkova on
Hi all, our project does sub-meter water for irrigation.
project footprint definiton
CS-2009 SSc5.1:Site development - protect or restore habitatposted by tanner white on
I have a building with 3 foot overhangs around it.
No minimal local zoning - ITE
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Raphael Iwata on
To achieve credit SSc4.4 we are using ITE study to determine the number of parking lots required.