CI-2009 SSc1:Site selectionposted by Lavanya Veerappa on
The requriement of the credit - "parking availability" is to meet but not exceed local norms.
Thermal Contrillability: No of thermostat points and alternative
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Yong Lee Low on
We have a total of 2385 individual spaces and to provide thermostats for 50% of these is required to score a point. which means is it that we are required to provide 1193 numbers of thermostats?
LED Job-site lighting earns ID point
NC-2009 IDc1:Innovation in designposted by Nadav Malin on
When we did an article in Environmental Building News a few months
sanitary installations within tenant fit-out
CS-2009 WEp1:Water use reductionposted by Michael Haugeneder on
Hello Our current core&shell project does not include sanitary installations, which will only be built at tenant fit-out stage.
Lesser parking numbers than local norms
CI-2009 SSc3.3:Alternative transportation - parking availabilityposted by Lavanya Veerappa on
The requriement of the credit - "parking availability" is to meet but not exceed local norms.
Use of general construction adhesives
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Daniel Overbey on
I received an interesting question from my contractor - he is requesting to use a general construction adhesives sent to him by the woodwork sub (it's a Liquid Nails product from Akzo Nobel Paints)
Tall Fescue - Native and Low-water for Area...Meet Requirement?
EBOM-2009 SSc5:Site development - protect or restore open habitatposted by Michelle Bracewell-Musson on
The credit requires Native/Adaptive vegetation, and turf seems out of the question. However, what if we use a turf variety that is Native with an addition of Low-water too?
Lighting power densities for building exteriors
CS-2009 EAp2:Minimum energy performanceposted by Rosana Correa on
The maximum power allowance for building façades is 2.2 W/m2 for each illuminated wall or surface.
WEc3 Baseline - or Existing Efficiency?
CI-2009 WEp1:Water use reductionposted by MacKenzie King on
We're looking to pursue this credit, but are a bit confused how the baseline is calculated for an interior renovation project with a portion of new construction.
PV in construction phase
CS-2009 EAc2:On-site renewable energyposted by Emmanuel Pauwels on
We have filed for design submittal and are moving into construction phase. The client decided to integrate PVs in the project.