Forum quick links
MR Calculator incorrect?
CS-2009 MRc5:Regional materialsposted by Reid Middlebrooks on
It appears that the BDC Material and Resource Calculator (July 2012) provided under the credit resources incorrectly calculates the Regional Material percentage.
Using Lease Agreement for Undesigned Elements
CS-2009 EAp2:Minimum energy performanceposted by Tony Schafer on
I am wondering if the tenant lease agreement can be used to specify undesigned elements for EAp2 similar to how it is used to achieve other credits.
Mandatory Provisions
NC-2009 EAp2:Minimum energy performanceposted by Diego Escalona on
Hello All, I have two questions about compliance with the mandatory provision: 1) Only the main air conditioning system should be evaluated with the tables in chapter 6?
Is it possible to design my building in parts?
CS-2009 EAp2:Minimum energy performanceposted by Ron Dean on
Hello!
Minimum Density Calculation
NC-2009 SSc2:Development density and community connectivityposted by Carmelito Tatlonghari on
In the Sustainable Sites CREDIT 2/ OPTION 1 – Development Density - I don’t understand why “the density calculation is based on a typical two-storey downtown development…” Why not on a 1-storey or
entryway systems for trucks
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Florian Schmidtchen on
In a manufacturing facility we have trucks and fork lift trucks entering the buildings.
Sample Commisioned Projects Criteria
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Jalal Avades on
What are the requirements/criteria to meet the 'Representative Projects'?
Sustainable Site Regional Priority Credit
CI-2009 SSc1:Site selectionposted by Dana Hodges on
I am working on a project in a region where the regional priority credits include SSC1 paths, C, E, G, H, and L, but do NOT include path A - selecting a LEED certified building.
Non-Motorized Right-of-Way
Pilot-Credits PC14:Walkable Streetsposted by Andrew Greene on
Two items: 1) A clarification of the language on non-motorized rights-of-way guidance. 2) A question whether the minimum height ratio is an appropriate measure of walkability in campus settings. 1
Certified Wood: Multiple buildings = Multiple invoices?
NC-2009 MRc7:Certified woodposted by Paola Figueiredo on
Hello! I'm working on a multiple-building project using AGMBC (an industrial facility).