IDC Materials Resources Calculator not calculating correctly
CI-2009 MRc4:Recycled contentposted by Mason Radkoff on
I'm using the "IDC Material and Resource Calculator (June 2012).xls" that's downloadable from the MRc4 Credit Resources page.
Server Room Equipment
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Matthew Macko on
Is there a list of the types of Energy Server Room Equipment to include in the calculations? For example, do we need to include WLAN controllers, control systems, etc.?
% of Cutsheets required?
CI-2009 MRc4:Recycled contentposted by Mason Radkoff on
A project I just received review comments on included 20.81% recycled content (as determined the correct formula to calculate recycled $ value). The review comments I received took no exception to
Educational Program
NC-2009 IDc1:Innovation in designposted by Patricia Missawa on
We intend to implement in our project an educational outreach program to engage the public through periodic events covering green building topics. However, it is not clear how many events they must
non potable water
NC-2009 WEp1:Water use reductionposted by Emmanuel Pauwels on
Part of the water for the WCs will be with non-potable water. How do we fill that out in the online leed template?
FSC Certified Products - Documentation?
EBOM-2009 MRc1:Sustainable purchasing - ongoing consumablesposted by Simon Sue on
In some of our current EB:O&M projects we have considered pursuing the MRc1 and MRc3 purchasing credits, claiming credit for FSC certified materials.
Data center consumption and the EAp2 - Case 2 – Option 1 Labs
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Carolina Vergnano on
We are trying to certify a laboratory in Brazil, and we are using the USGBC Calculator and the LABS21.
VOCs of materials Defining the Building Envelope
CI-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Andrew Gil on
I've understood the LEED EQc4.1-4.3 requirements, including the reference standards, and have pursued LEED credits for these numerous times over the past 10 years, but have more recently have had p
Completing EAp3 Form Without Equipment Information
CS-2009 EAp3:Fundamental refrigerant managementposted by Tony Schafer on
I am having trouble completing the EAp3 form. Since there won't be any cooling equipment installed as part of this C&S project, there is nothing to fill out in table L-2.
Completing WEp1 Form Without Fixtures Specified
CS-2009 WEp1:Water use reductionposted by Tony Schafer on
I am having trouble completing the WEp1 form. Since there won't be any fixtures installed as part of this C&S project, there is no fixture schedule to upload.