Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

IEQ Pr1 & c2 - work code in France in place of ASHRAE

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Nicolas MOLLE  on 

Hello, IEQ-p1: Work code is more stringent than ASHRAE, so we'll use work code air rate to justify prerequisite The question is: we want to obtain the IEQ-C2 increasing by 30% the air rate BUT o

1
Fri Sep 14, 2012, 2:45 pm

percentage versus actual TSS number

NC-2009 SSc6.2:Stormwater design - quality control
posted by  Adrienn Gelesz  on 

Hi! Does anyone know how to convert remaining g/l data into percentage data?

1
Fri Sep 14, 2012, 11:21 am

NC project schedule overlap with EBOM performance period?

EBOM-2009 SSc1:LEED certified design and construction
posted by  Tiffany Moore  on 

I'm working with a project team that had planned to certify their facility under NC and follow immediately with a performance period for EBOM certification.

1
Mon Oct 22, 2012, 9:55 pm

tenant compliance required?

EBOM-2009 MRp2:Solid waste management policy
posted by  Jill Ziegler  on 

Can anyone elaborate on the following credit language?

1
Fri Sep 14, 2012, 4:44 pm

Help with a new study of green water technologies!

NC-2009 WEp1:Water use reduction
posted by  Chris Pyke  on 

The Water Research Foundation and Virginia Tech have partnered for a study on the unanticipated consequences of green water technologies and practices on water use in buildings.

0

Permeable areas

EBOM-2009 WEc3:Water efficient landscaping
posted by  Lourdes Salinas  on 

I'm curious on what everyone thinks about permeable areas covered with gravel; are these considered landscape areas and account for the 5% landscape area requirement?

1
Mon Sep 17, 2012, 3:12 am

FIre Station Apparatus Bay

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Chris Mullinax  on 

I'm working on a FIre Station with a 7500 sq. ft. apparatus bay. The bay is approximately 75' X 100' with (3) 195 sq. ft. doors on each of the long ends (6 doors total). Ceiling Height is 20'.

1
Thu Oct 11, 2012, 6:01 pm

The Correct Limit of VOC to Use

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Abdulrahman Sherazy  on 

Good morning friends, I would like to understand how to use the table SCAQMD Rule 1113 to know the VOC limit in any material in general, and in floor coating specifically.

1
Sun Sep 16, 2012, 8:17 am

EAc1: equivalence energy calculation for french project ???

NC-2009 EAc1:Optimize energy performance
posted by  Nicolas MOLLE  on 

Hello, I'd like to know if anyone can appreciate the levl of results for a french project under ASHRAE ?

1
Mon Sep 17, 2012, 2:34 pm

New & exisiting space and minimum requirements?

NC-2009 EAp2:Minimum energy performance
posted by  Chris Miller  on 

I have a project that is an exisiting building renovation with an addition. I understand my energy model will be based on a combination of the new & existing.

1
Mon Sep 17, 2012, 2:38 pm