Forum quick links
Green Power Purchase for LEED NC 2009
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Chris Swale on
Is there any on-going requirement beyond the initial 2 year contract for a green power purchase?
Exclusions
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by R Jones on
If products have a % of recycled content which is assessed under MRc4 does this mean that the whole product is excluded from these calculations or just the portion which has the recycled content?
Evidence of VOC content
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Devani PERERA on
Is a letter from the manufacturer specifying the VOC content of the prodcut acceptable as evidence of VOC content when this piece of information is not present on the cutsheet? This letter gives pr
Public R.O.W.
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by James Wieben on
I am working on a project where the building footprint occupies the entire site. The project is constructing completely new surface amenities inthe right-of-way, including landscaping.
Windows
CI-2009 MRc1.2:Building reuse - maintain interior nonstructural elementsposted by Sustentator Argentina on
For windows we count both sides or only one side?
Material Reused in another location
CI-2009 MRc3.1:Materials reuseposted by Sustentator Argentina on
Hello. I have a question for something that I might be interpreting wrongly because of language.
Confusing Review Comment
NC-2009 IEQc7.1:Thermal comfort - designposted by Brian Carpenter on
We submitted a single psych chart with coil conditions and comfort zone range (from 0.5 clo to 1.0 clo), and narrative.
Building Footprint Clarification
NC-2009 PIf2:Project Summary Detailsposted by James Wieben on
The project I am documenting has 6 floors above grade. None of the floors have an identical floor plate.
Floor Area Ratio Calculation
NC-2009 PIf2:Project Summary Detailsposted by James Wieben on
The property my project is being built upon is 25,920 SF and my LEED Project Boundry contains 31,348 SF.
Energy Modeling for DMV Inspection Station
NC-2009 EAp2:Minimum energy performanceposted by Maria Fiorelli on
We have a project in question that is DMV office and vehicle inspection station. The vehicle inspection lanes side of the building are approximately 50% of the total project square footage.