Forum quick links
UnmetLoadHours - Do we have clarity yet?
NC-2009 EAp2:Minimum energy performanceposted by Jean Marais on
The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet?
Option 1 - is a residential element required?
CI-2009 SSc2:Development density and community connectivityposted by R Jones on
If a project is pursuing option 1 development density calculations must there be a residential element recorded within the 60,000sf/acre figure? thank you
E -waste goes back to manufacturer
EBOM-2009 MRc8:Solid waste management - durable goodsposted by Anna Korinkova on
Our building has a large number of tenants with separate management. Their IT equipment go back to the manufacturer and do not go to the building main waste stream.
auto-shutoff faucets
NC-2009 WEp1:Water use reductionposted by Jonathan Weiss on
I am sure this has been answered elsewhere in this listing but I am confused by the back and forth about auto-shutoff faucets, the most common commercial lavatory faucet in much of the work I am in
Brewery Process Load - Baseline and Proposed Case Set-up
NC-2009 EAp2:Minimum energy performanceposted by Xun Jia on
The brewery I am modeling has large percentage of energy consumption associated with the process load.
preserved for the life of the building?
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Erin Holdenried on
Is it required that habitat area be preserved for the life of the building (like open space in SSc5.2). The credit does not specfy this requirement.
Baseline Lighting Power density
NC-2009 EAp2:Minimum energy performanceposted by Zonda E. Team on
Hi, Can you help with the following two issues: 1.I understand proposed total installed lighitng power has to be the same in the energy model and in SSc8.
Location of bicycle storage
CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Dean Barone on
We have a situation where the footprint of the site is too small to accommodate all of the required bicycle racks serving our project in one area.
Rental Laundry Supplied Entrance Mats
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Charles Eichelberger on
I am new to Leed Requirements, and as my company manufactures walk-off mats, I am currently assisting one of our laundry rental customers in providing 10-ft, laundered entrance way walk-off mats to
ASHRAE 90.1 Add G table G3.1 baseline
CS-2009 EAc1:Optimize energy performanceposted by charles bell on
We have a building which is six stories. The first floor is retail, second thru fifth is office and sixth is residential. All are served from a virtual central plant.