Base case system for high equipment loads spaces
NC-2009 EAp2:Minimum energy performanceposted by Nandana Kumar on
The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft.
Water waste
NC-2009 MRc2:Construction waste managementposted by Karim Farah on
During coentsruction, a project has a major amount of water waste (more than 50% of the total amount of the waste generated by one production unit), this quantity of water is a result of the produc
Tap for bar counter
Retail-CI-v2009 WEp1:Water use reductionposted by Eddy Tsang on
Should i include the tap for the bar counter in the water use reduction calculation?
Process energy
NC-2009 EAp2:Minimum energy performanceposted by Graham Langton on
Regarding what is taken as a process energy.
Can the CxA be involved in the thermal model of EAp2?
NC-2009 EAc3:Enhanced commissioningposted by Maya Karkour on
Dear All, We are consulting for a large LEED-NC tower. The thermal model for EAp2 / EAc1 were undertaken by a company independant from the design team.
GIBp1
ND-v2009 GIBc1:Certified green buildingsposted by Nader NAKIB on
Will a BREEAM certified building in an ND project count towards LEED GIB prerequisite one?
Documentation only for regularly occupied spaces?
CS-2009 IEQc7:Thermal comfort - designposted by Marco Abdallah on
Do we have to provide documentation that the design conditions fall within the ASHRAE 55-2004 just for regularly occupied spaces (e.g.
EPA Target Finder rating tool
Schools-2009 EAp2:Minimum energy performanceposted by Ameet AA on
Following requirement is stated even in the LEED 2009 School Alternative compliances path for project outside the U.S.(July 2012) "The project must establish an energy performance rating goal for
Part Residence and Part Office
NC-2009 EAp2:Minimum energy performanceposted by April Ambrose on
I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential. I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running into a
EAc5 Option 3
NC-2009 EAc5:Measurement and verificationposted by Crina Bosch on
We have a large project that is on a DES - We meet the criteria that forces us to include upstream DES equipment.