Base case system for high equipment loads spaces

NC-2009 EAp2:Minimum energy performance
posted by  Nandana Kumar  on 

The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft.

1
Tue Dec 4, 2012, 2:42 pm

Water waste

NC-2009 MRc2:Construction waste management
posted by  Karim Farah  on 

During coentsruction, a project has a major amount of water waste (more than 50% of the total amount of the waste generated by one production unit), this quantity of water is a result of the produc

1
Mon Dec 10, 2012, 6:07 pm

Tap for bar counter

Retail-CI-v2009 WEp1:Water use reduction
posted by  Eddy Tsang  on 

Should i include the tap for the bar counter in the water use reduction calculation?

1
Thu Dec 13, 2012, 9:10 pm

Process energy

NC-2009 EAp2:Minimum energy performance
posted by  Graham Langton  on 

Regarding what is taken as a process energy.

1
Mon Dec 3, 2012, 3:19 pm

Can the CxA be involved in the thermal model of EAp2?

NC-2009 EAc3:Enhanced commissioning
posted by  Maya Karkour  on 

Dear All, We are consulting for a large LEED-NC tower. The thermal model for EAp2 / EAc1 were undertaken by a company independant from the design team.

1
Mon Dec 3, 2012, 7:43 pm

GIBp1

ND-v2009 GIBc1:Certified green buildings
posted by  Nader NAKIB  on 

Will a BREEAM certified building in an ND project count towards LEED GIB prerequisite one?

1
Mon Dec 3, 2012, 2:34 pm

Documentation only for regularly occupied spaces?

CS-2009 IEQc7:Thermal comfort - design
posted by  Marco Abdallah  on 

Do we have to provide documentation that the design conditions fall within the ASHRAE 55-2004 just for regularly occupied spaces (e.g.

1
Wed Dec 5, 2012, 1:42 pm

EPA Target Finder rating tool

Schools-2009 EAp2:Minimum energy performance
posted by  Ameet AA  on 

Following requirement is stated even in the LEED 2009 School Alternative compliances path for project outside the U.S.(July 2012) "The project must establish an energy performance rating goal for

1
Mon Dec 3, 2012, 5:17 pm

Part Residence and Part Office

NC-2009 EAp2:Minimum energy performance
posted by  April Ambrose  on 

I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential. I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running into a

1
Thu Dec 6, 2012, 7:26 am

EAc5 Option 3

NC-2009 EAc5:Measurement and verification
posted by  Crina Bosch   on 

We have a large project that is on a DES - We meet the criteria that forces us to include upstream DES equipment.

1
Mon Dec 3, 2012, 5:27 pm