Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Unknown CFM into spaces

EBOM-2009 IEQp1:Minimum indoor air quality performance
posted by  Sonrisa Lucero  on 

We are using the 62MZ Calculator spreadsheet for an office building. The HVAC system does not utilize VAV boxes or any kind of terminal unit. Rather, it just feeds directly into each space.

1
Wed Jan 30, 2013, 2:29 pm

Measuring the landscaped area

NC-2009 WEc1:Water efficient landscaping
posted by  Alicia Villanueva  on 

We are trying to reach the 5% landscaped area in a project. The question is: how do we measure it? The shaded area or the tree well area? Thank you!

1
Fri Jan 11, 2013, 7:49 pm

Irrigation by hose

NC-2009 WEc1:Water efficient landscaping
posted by  Marcio Alberto Casado Pereira  on 

Hi, my project will use non-potable irrigation by hose, but the template of LEED online don't show this option. How can I calculate the efficiency of this method? Thanks in advance

1
Sat Jan 26, 2013, 12:31 am

Compliance for SS CR 3 & IEQ CR 3.6

EBOM-2009 IEQc3.6:Green cleaning - indoor integrated pest management
posted by  ABHIJIT PISAL  on 

Our client uses pesticides/chemicals which are allowed to use in India as per local regulation.

1
Wed Feb 6, 2013, 8:01 pm

Fire Stopping Sealants

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Mariah Grife  on 

I am currently tracking the LEED Data for a construction project I am on.

1
Mon Jan 14, 2013, 5:01 pm

street network

Pilot-Credits PC9:Street Network
posted by  Sara Aschliman  on 

It appears that our project will qualify for this point, and I do believe that the spirit of the credit positively reinforces the walkability of our neighborhood site as the increased intersections

0

MPR 6 - Energy Star Portfolio Manager not for future buildings?

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Cassandra Kail  on 

I am currently working on a LEED-NC 2009 Multiple Building Project. We are having a problem with MPR 6; commit to showing whole-building energy and water use data.

1
Mon Jan 14, 2013, 7:08 pm

definition of greenfield for commercial interiors

CI-2009 SSc2:Development density and community connectivity
posted by  Ken Dooley  on 

Hi all, how can a fit-out that is to be certiifed by commercial interiors be a "greenfield development" ? Surely once the core and shell project is completed, the fit-out is on a previously develop

1
Mon Jan 21, 2013, 3:42 pm

Alternative Compliance Path Case 1: Lease Document

CI-2009 EAc3:Measurement and verification
posted by  Carolina Acevedo  on 

Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.

1
Tue Jan 15, 2013, 6:52 pm

Undefined Outdoor Spaces

CS-2009 SSc6.1:Stormwater design - quantity control
posted by  Luis Miguel Diazgranados  on 

Greetings Everyone I'm working on a office project with outdoor spaces within the LEED Boundary. The project's construction phase is almost finished.

1
Fri Mar 22, 2013, 4:41 am