Forum quick links
Table EA.P.2.1 Space Summary
NC-2009 EAp2:Minimum energy performanceposted by Christopher Strunk on
Quick Question on filling out this summary chart: Within the LEED BD&C v.2009 reference manual (page 279) they indicate a very generic breakdown of building spaces based on occupancy types - a
International Project - Signage issues
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Jaida Anderson-Lozano on
Our project has been denied this credit because we do not use the exact verbage required for the signage.
Wood and plastic composite
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Noriko Nagazumi on
Is it correct to state that wood and plastic composites are not included in this credit requirements? Quoted from above: "Composite wood and agrifiber products are defined as particleboard, medium
Dismantling of building
NC-2009 MRc3:Materials reuseposted by Tanja Arnesson on
Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.
District Energy Systems: Confusion
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Marco Abdallah on
We are working on a CI-Certification of a tenant space (5 floors) in a highrise building with around 40 floors.
WEc1 Option 1
NC-2009 WEc1:Water efficient landscapingposted by Arzu Tugrul on
We have a project located in Vienna. More than %80 of the landscaped areas has been designed for no irrigation including green roof.
roll-out mat specs
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by NA AN on
I just want to check if there are any specific product specs for a LEED compliant roll-out mat? thank you Na
LED Lamps in Fixtures Designed for Other Lamps
NC-2009 EAc1:Optimize energy performanceposted by Pat Thomas on
We are planning to use fixtures designed for use with MR-16 or incandescent lamp but will be installing LED lamps.
EPA Number
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Alicia Villanueva on
If one of the product used does not have an EPA Number: are we still eligible for this credit? GH
Task Lighting Lamps
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by Saju Varghese on
Do task lighting lamps need to be included in this credit?