Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Responsible party for preparing M&V plan

NC-2009 EAc5:Measurement and verification
posted by  Becky Dix  on 

What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?

1
Wed Apr 10, 2013, 2:34 pm

Controller efficiency factor (CE)

NC-2009 WEc1:Water efficient landscaping
posted by  Ricardo Sá  on 

During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).

0

ND standard vs the NC standard

ND-v2009 GIBp4:Construction activity pollution prevention
posted by  Amanda Tullos  on 

Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th

1
Thu Mar 28, 2013, 3:01 pm

Mini-split efficiency

NC-2009 EAp2:Minimum energy performance
posted by  Leandro Silva  on 

We are having trouble verifying the efficiency compliance of mini-split air conditioners available in Brazil. They are rated in COP where ASHRAE requirements are stated in SCOP.

1
Mon Apr 1, 2013, 8:33 pm

Dedicated exhaust in areas of chemical storage- Janitor's closet

EBOM-2009 IEQc3.1:Green cleaning - high performance green cleaning program
posted by  Karin Wohlert  on 

LEED EBOM does not appear to have any credit that requires direct exhaust areas that store chemicals such as a Janitor's closet might contain.

1
Thu Apr 4, 2013, 9:52 pm

Automated Demand Response

CS-2009 EAp2:Minimum energy performance
posted by  Ryan McEvoy  on 

We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.

1
Mon Apr 1, 2013, 12:09 am

Treated water for landscaping

EBOM-2009 WEc3:Water efficient landscaping
posted by  Manasi Kulkarni  on 

Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.

1
Mon Apr 1, 2013, 6:43 pm

why the distance between the

NC-2009 SSc1:Site selection
posted by  sujata shakya  on 

why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......

1
Mon Apr 1, 2013, 1:50 pm

Infrequent Transient Loads

NC-2009 PIf3:Occupant and Usage Data
posted by  Allison Zuchman  on 

I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.

1
Wed Apr 24, 2013, 6:08 pm

SRI of White Stone Ballast

NC-2009 SSc7.2:Heat island effect - roof
posted by  Tate Walker  on 

I am working on a project that has roughly 50% of the roof surface covered in white colored (not white coated) stone ballast and 50% white PVC.

1
Tue Apr 2, 2013, 2:16 pm