Forum quick links
Responsible party for preparing M&V plan
NC-2009 EAc5:Measurement and verificationposted by Becky Dix on
What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?
Controller efficiency factor (CE)
NC-2009 WEc1:Water efficient landscapingposted by Ricardo Sá on
During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).
ND standard vs the NC standard
ND-v2009 GIBp4:Construction activity pollution preventionposted by Amanda Tullos on
Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th
Mini-split efficiency
NC-2009 EAp2:Minimum energy performanceposted by Leandro Silva on
We are having trouble verifying the efficiency compliance of mini-split air conditioners available in Brazil. They are rated in COP where ASHRAE requirements are stated in SCOP.
Dedicated exhaust in areas of chemical storage- Janitor's closet
EBOM-2009 IEQc3.1:Green cleaning - high performance green cleaning programposted by Karin Wohlert on
LEED EBOM does not appear to have any credit that requires direct exhaust areas that store chemicals such as a Janitor's closet might contain.
Automated Demand Response
CS-2009 EAp2:Minimum energy performanceposted by Ryan McEvoy on
We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.
Treated water for landscaping
EBOM-2009 WEc3:Water efficient landscapingposted by Manasi Kulkarni on
Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.
why the distance between the
NC-2009 SSc1:Site selectionposted by sujata shakya on
why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......
Infrequent Transient Loads
NC-2009 PIf3:Occupant and Usage Dataposted by Allison Zuchman on
I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.
SRI of White Stone Ballast
NC-2009 SSc7.2:Heat island effect - roofposted by Tate Walker on
I am working on a project that has roughly 50% of the roof surface covered in white colored (not white coated) stone ballast and 50% white PVC.