Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Automated Demand Response

CS-2009 EAp2:Minimum energy performance
posted by  Ryan McEvoy  on 

We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.

1
Mon Apr 1, 2013, 12:09 am

Treated water for landscaping

EBOM-2009 WEc3:Water efficient landscaping
posted by  Manasi Kulkarni  on 

Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.

1
Mon Apr 1, 2013, 6:43 pm

why the distance between the

NC-2009 SSc1:Site selection
posted by  sujata shakya  on 

why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......

1
Mon Apr 1, 2013, 1:50 pm

Infrequent Transient Loads

NC-2009 PIf3:Occupant and Usage Data
posted by  Allison Zuchman  on 

I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.

1
Wed Apr 24, 2013, 6:08 pm

SRI of White Stone Ballast

NC-2009 SSc7.2:Heat island effect - roof
posted by  Tate Walker  on 

I am working on a project that has roughly 50% of the roof surface covered in white colored (not white coated) stone ballast and 50% white PVC.

1
Tue Apr 2, 2013, 2:16 pm

VRP calculation using design occupancy value

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Cassini Kit  on 

I have a question about the occupancy value of VRP calculation.

1
Tue Apr 2, 2013, 4:08 pm

Urinal pre-wash and fuzzy control

NC-2009 WEp1:Water use reduction
posted by  Noriko Nagazumi  on 

Hi all, How would you set the water use for urinals that: 1. Have a 2 liter pre-wash that may be used or turned off 2.

0

typical floor v/s whole building simulation

CS-2009 EAp2:Minimum energy performance
posted by  shashank jain  on 

Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.

1
Tue Apr 2, 2013, 1:12 pm

Upper limit?

EBOM-2009 EAc2.2:Existing building commissioning - implementation
posted by  American University  on 

I'm wondering if all identified ECMs have to be included in a longer term capital improvement plan OR if the audit revealed a project with, say, a 12 year pay back period and high implementation co

1
Tue Apr 2, 2013, 2:02 pm

CONCRETE MIX REPORTING

CI-2009 MRc5:Regional materials
posted by  Shane Tohara  on 

We are using 2 seperate concrete mixes on our CI project. A letter from the manufacture details the raw materials and ratios for each mix. Each type of mix is clearly identified on the invoice.

1
Tue Apr 2, 2013, 3:08 pm