Core and shell dedicated exhaust systems?
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Mike D on
Do the projects under core and shell have to providde dedicated exhasut systems for tenant print or copy rooms?
Zero-lot line project, but required to install street trees
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Courtney Royal on
Our project is in NYC and pretty much on zero-lot line property with very little open space.
LEED Canada 2009 option 1
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by nancy picard on
Our project is a retail center and only option 1 is available to us for credit SS4.4.
Vandal-resistant aerator
NC-2009 WEp1:Water use reductionposted by Marc Mondor on
Hello, We just got our review back for a new construction of an office building. For this credit we had a comment from the reviewer, that we have never encounter before.
LEED for Homes
CI-2009 SSc1:Site selectionposted by Ryan McEvoy on
We have a project that is moving into a building that has been certified under LEED for Homes Mid-Rise. Can the project still pursue option 1?
STC for Ceiling Assembly
Schools-2009 IEQc9:Enhanced acoustical performanceposted by PREMNATH SUNDHARAM on
I'm filling out the Table IEQc9-1 and it asks me for a STC rating for the ceiling assembly. I set the space "adjacent to assembly" to "outdoors " because it is only a 1-story building.
Tenant/Owner Do Not Purchase Food for Occupants...So I Did.
EBOM-2009 MRc5:Sustainable purchasing - foodposted by Michelle Bracewell-Musson on
I have wriiten verification the Tenant (State Office) and Owner do not make food purchases (none for tea/coffee either), therefore, I bought my own UDA Certified Organic and had a the LEED Charrett
Separate Buildings, Same Cellar
NC-2009 MRp1:Storage and collection of recyclablesposted by Jesus Deras on
I have two hotel projects(190K & 98K) which will be filed as two separate LEED projects that have a combined cellar.
LEED Project Boundary in case of uderground parking
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mario Pinoli on
Hello, just a question about LEED Project Boundary.
Feed-in tariffs
CS-2009 EAp2:Minimum energy performanceposted by BH . on
Hi, Hi, in EU most countries have feed-in-tarriffs, which reimburse the owner for energy produced at a higher rate than the cost of energy.