Forum quick links
Autocontrol / metering urinals - 12sec or optional?
CS-2009 WEc3:Water use reductionposted by Petr Vogel on
Dear all, when calculating proposed case water consumption budget for public autocontrol / metering urinals…is there the same requirement like the 12sec requirement for public autocontrol / meteri
Combination of Test and Flush
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Michael McVinney on
On a hangar project, there is a conditioned Admin space and an unconditioned Hangar space.
Major Renovation vs. New Construction
NC-2009 EAp2:Minimum energy performanceposted by MT A on
We are working on a library project that involves the renovation of an existing facility, and the addition of a new wing.
Pilot credit 10
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Alicia Villanueva on
Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 40%. In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary stand
Building Footprint
CS-2009 SSc5.1:Site development - protect or restore habitatposted by Marcela Larrain on
In our Project we have an underground floor with retail program that has a larger projection that the ground floor which is also retail.
New vs. Recycled Wood
CI-2009 MRc7:Certified woodposted by Kevin Dunham on
Is paint-grade molding (made from short pieces finger-jointed together to form a usable length) considered new wood or recycled wood (presumably 100% pre-consumer)?
Bi-weekly Inspections - must be done by??
EBOM-2009 IEQc3.6:Green cleaning - indoor integrated pest managementposted by Michelle Bracewell-Musson on
The Plan requires biweekly inpections: 'Visual inspections shall be performed at least 2 times per month, with treatment if necessary.
Compliance for LEED, ASHRAE 62.1. Ventilation System controls
NC-2009 IEQp1:Minimum indoor air quality performanceposted by JOSE R. TAGLE on
To meet the minimum requirements from section 4 to 7 of ASHRAE 62.1-2007, we must comply with section 5.4 "Ventilation System controls", and for this we should include controls that enable system t
LEED Heatlhcare - FTE Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by Craig Pryde on
We are working on a new MOB with 4 of 6 tenant suites being completed at the same time as shell/core.
Racking system in warehouse
CS-2009 MRc5:Regional materialsposted by Jean-Baptiste Noel on
In a C&S warehouse project, I was wondering whether the racking system could be counted in the materials list (as long as put consistently in all MR credits of course)? I am not including the f