Forum quick links
One built-out floor in a CS
NC-2009 PIf3:Occupant and Usage Dataposted by Jason Biondi on
I am working on a three story office building, that is registered as LEED Core & Shell, where the 2nd floor will be built-out for the owner's company, which means we know the occupancy of the 2
Review
NC-2009 WEc3:Water use reductionposted by Alicia Villanueva on
My project has achieved a 82% savings in flow & flush fixtures through recycling 100% of the waste water and reusing it for WC and urinal flushing. We documented this with a spreadsheet. Howe
Option 1
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
Under Option 1 what does the following actually mean? If the total weight is more than five percent of the product by weight, furniture components must be included.
Medical Equipment
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
How does medical equipment factor into this credit?
Naturally or mechanically conditioned?
NC-2009 IEQc7.1:Thermal comfort - designposted by Alicia Villanueva on
Our project is a car showroom in a location where no air conditioning nor heating is needed due to the mild clima throughout the year. This is an occupied, enclosed space.
SSc4.3 and SSc4.4
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Sheryl Swartzle on
There is no new parking provided within the LEED boundary of our project (no parking at all). The project is part of a performing arts center campus.
Minimize Sediment Track Out question...
NC-2009 SSp1:Construction activity pollution preventionposted by Rick Alfandre on
We have a construction site with an existing 40 ft asphalt driveway & entry/exit, which we will be using as our only construction entry point.
Tile Crack Prevention Underlay
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by L W on
Do crack-prevention self-adhering underlays under tile fall under the LEED 4.3 scope? Do they need to be FloorScore Certified? Thanks in advance,
Off-grid Project in Mexico
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Jeremy Kuhre on
We are currently evaluating an off-grid hospitality project in Mexico. The project is primarily powered by a 32kW PV array which is sometimes supplemented by a propane generator.
LPB for a Residential Building Excluding the Shopping Mall
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Orçun Özhelvaci on
Dear experts, I would like to hear about your comments on the following issue: In one of our projects, a residential building is being constructed on top of a shopping mall both of which are constr