Connection of sidewalks
Pilot-Credits PC14:Walkable Streetsposted by Karyn Rodrigues on
For this credit, one of the requirements is "Continuous sidewalks [...] serve all buildings [...] and connect them with public sidewalks.".
Manual Equipment
EBOM-2009 IEQc3.4:Green cleaning - sustainable cleaning equipmentposted by Timothy Casper on
Can manual equipment (ex: a carpet sweeper) that is used in place of powered equipment (ex: a vacuum) be counted when trying to achieve the 20% threshold for compliant inventory equipment?
One built-out floor in a CS
NC-2009 PIf3:Occupant and Usage Dataposted by Jason Biondi on
I am working on a three story office building, that is registered as LEED Core & Shell, where the 2nd floor will be built-out for the owner's company, which means we know the occupancy of the 2
Review
NC-2009 WEc3:Water use reductionposted by Alicia Villanueva on
My project has achieved a 82% savings in flow & flush fixtures through recycling 100% of the waste water and reusing it for WC and urinal flushing. We documented this with a spreadsheet. Howe
Option 1
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
Under Option 1 what does the following actually mean? If the total weight is more than five percent of the product by weight, furniture components must be included.
Medical Equipment
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
How does medical equipment factor into this credit?
Naturally or mechanically conditioned?
NC-2009 IEQc7.1:Thermal comfort - designposted by Alicia Villanueva on
Our project is a car showroom in a location where no air conditioning nor heating is needed due to the mild clima throughout the year. This is an occupied, enclosed space.
SSc4.3 and SSc4.4
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Sheryl Swartzle on
There is no new parking provided within the LEED boundary of our project (no parking at all). The project is part of a performing arts center campus.
Minimize Sediment Track Out question...
NC-2009 SSp1:Construction activity pollution preventionposted by Rick Alfandre on
We have a construction site with an existing 40 ft asphalt driveway & entry/exit, which we will be using as our only construction entry point.
Tile Crack Prevention Underlay
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by L W on
Do crack-prevention self-adhering underlays under tile fall under the LEED 4.3 scope? Do they need to be FloorScore Certified? Thanks in advance,