Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Connection of sidewalks

Pilot-Credits PC14:Walkable Streets
posted by  Karyn Rodrigues  on 

For this credit, one of the requirements is "Continuous sidewalks [...] serve all buildings [...] and connect them with public sidewalks.".

0

Manual Equipment

EBOM-2009 IEQc3.4:Green cleaning - sustainable cleaning equipment
posted by  Timothy Casper  on 

Can manual equipment (ex: a carpet sweeper) that is used in place of powered equipment (ex: a vacuum) be counted when trying to achieve the 20% threshold for compliant inventory equipment?

1
Thu Jun 6, 2013, 2:59 pm

One built-out floor in a CS

NC-2009 PIf3:Occupant and Usage Data
posted by  Jason Biondi  on 

I am working on a three story office building, that is registered as LEED Core & Shell, where the 2nd floor will be built-out for the owner's company, which means we know the occupancy of the 2

1
Thu Jul 25, 2013, 6:45 pm

Review

NC-2009 WEc3:Water use reduction
posted by  Alicia Villanueva  on 

My project has achieved a 82% savings in flow & flush fixtures through recycling 100% of the waste water and reusing it for WC and urinal flushing. We documented this with a spreadsheet. Howe

1
Sun Nov 3, 2013, 7:00 pm

Option 1

Healthcare-v2009 MRc5:Furniture and medical furnishings
posted by  Catherine Blakemore  on 

Under Option 1 what does the following actually mean? If the total weight is more than five percent of the product by weight, furniture components must be included.

0

Medical Equipment

Healthcare-v2009 MRc5:Furniture and medical furnishings
posted by  Catherine Blakemore  on 

How does medical equipment factor into this credit?

1
Tue Jul 23, 2013, 8:43 pm

Naturally or mechanically conditioned?

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Alicia Villanueva  on 

Our project is a car showroom in a location where no air conditioning nor heating is needed due to the mild clima throughout the year. This is an occupied, enclosed space.

1
Tue Jun 4, 2013, 8:23 pm

SSc4.3 and SSc4.4

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Sheryl Swartzle  on 

There is no new parking provided within the LEED boundary of our project (no parking at all). The project is part of a performing arts center campus.

1
Sun Nov 3, 2013, 2:31 am

Minimize Sediment Track Out question...

NC-2009 SSp1:Construction activity pollution prevention
posted by  Rick Alfandre  on 

We have a construction site with an existing 40 ft asphalt driveway & entry/exit, which we will be using as our only construction entry point.

1
Tue Jun 4, 2013, 8:56 pm

Tile Crack Prevention Underlay

CS-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  L W  on 

Do crack-prevention self-adhering underlays under tile fall under the LEED 4.3 scope? Do they need to be FloorScore Certified? Thanks in advance,

1
Fri Jun 7, 2013, 11:09 pm