Forum quick links
Accounting for common/shared areas
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Robert Calloway on
This question is in regards in to LEED CI 2009 - Credits EAc1.1 & EAc1.2 for lighting power density and light controls. Do tenants have to account for common areas and spaces for lighting powe
Accounting for common/shared areas
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Robert Calloway on
This question is in regards in to LEED CI 2009 - Credits EAc1.1 & EAc1.2 for lighting power density and light controls. Do tenants have to account for common areas and spaces for lighting powe
Buildings Attached to non LEED-certified buildings
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Zachary Mathern on
I am referring to the Supplemental Guidance to the MPR's; All Attached Buildings, 2) Treating Energy Systems.
Uploaded drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by Michael Beattie on
I've been waiting to upload the drawings for our project until the revisions generated by Owner and Contractor have been complete, and the drawings reflect what's actually being constructed.
School as a Teaching Tool vs ID Green Building Education Program
Schools-2009 IDc3:The school as a teaching toolposted by Rebecca Molldrem on
Since ID Credit 3 is an option under LEED for Schools, does this mean that if a project is not pursuing this, they also wouldn't be able to pursue an Innovation in Design credit for a Green Buildin
Calculating parking area
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Sean Hogan on
I have a project seeking certification which has approximately 750 surface car parking spaces.
Complete information on Variable Speed Control
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Mike D on
There are no pumps or VAV fans on this project which are 5hp or greater.
Energy modeling review question
NC-2009 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
For a LEED project that recently received the preliminary design review comments, we were asked to analyze and correct the documentation to comply with pre-requisite EAp2.
Process Equipment Refrigerant
EBOM-2009 EAp3:Fundamental refrigerant managementposted by Jalal Avades on
I have a school building with an old walk-in coolers/freezers used in the Kitchen. Those do have CFC refrigerant.
Plant space in Default occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Mike D on
We have included all areas of the building within the Default Occupancy Table. However, there is still the Plant Space we have not included. Can this be omitted?