Forum quick links
Natural Ventilation in Baseline?
NC-2009 EAp2:Minimum energy performanceposted by Marina Andrade on
In environments where they will be covered by natural ventilation, how should I proceed in baseline model? For example, a factory or warehouse with the proposed natural ventilation, must be equal
SSc6.2 in urban areas
CS-2009 SSc6.2:Stormwater design - quality controlposted by BH . on
Hi, there is a sentence in LEED Reference Guide which makes me really confused (page 103): “For existing sites with greater than 50% imperviousness, structural techniques may include restoring a
District Energy Systems
NC-2009 EAc1:Optimize energy performanceposted by Matt Humphreys on
I have project that is purchasing chilled water from the local utility.
LEED CI - Scope of work required
NC-2009 PIf1:Minimum Program Requirementsposted by Michael Smithing on
Is there any requirement in the LEED CI MPRs (which I have not found) that a tenant space actually undergo modification to be certified?
SSc6 - Site Improvement Plan
EBOM-v4 SSc6:Site improvement planposted by Levi Jimenez on
Our clients facility is exploring avenues to improve the site to comply with this credit, but is in a dense urban area (Oakland, Ca) and the landscaping on the site itself can not undertake any fur
Repealed?
Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?
Option 2-Air Testing - Building with Phased Completion
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Lilian Seow on
We r building 424 residential units - 46 storeys high tower.
Core performance path
NC-2009 EAc1:Optimize energy performanceposted by Jatuwat Varodompun on
Core performance path We plan go for the option 3 the core performance 1 For Section 2.9 equipment efficiency, We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".
Square feet calculation
NC-2009 EAp2:Minimum energy performanceposted by LORENZO ORSENIGO on
Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is
Monthly energy use data
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Natascha Altensen on
Hello, does anyone know, whether energy data used for the Energy Star Portfolio Manager rating have to be based on monthly summaries or if they can also be submitted as quaterly or annual summaries