Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

heating section type

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

I'm modeling a baseline system according to System 5. I am considering Table 6.8.1A in order to determine the performance of the DX cooling coils.

1
Mon Sep 23, 2013, 1:53 pm

Path 4

CI-2009 SSc1:Site selection
posted by  Mike D  on 

Can the project achieve Path4 if there are no parking spaces within the building. The project is a zero lot line as well. Thanks!

1
Mon Nov 4, 2013, 4:02 pm

Modeling a Commercial Kitchen

NC-2009 EAp2:Minimum energy performance
posted by  September Silvers  on 

Hi, I am trying to model a dining facility and am finding it difficult to determine the best way to include the energy associated with the kitchen equipment.

0

Furniture Packaging Waste

NC-2009 MRc2:Construction waste management
posted by  Gavin Simone  on 

Our client is purchasing new furniture for a newly constructed building. We're using the LEED NC 2009 rating system.

1
Mon Sep 30, 2013, 3:36 pm

Modeling a commercial kitchen

NC-2009 EAp2:Minimum energy performance
posted by  September Silvers  on 

I am trying to model a commercial kitchen. I read through previous threads and found some helpful information on including fan power for this type of space.

1
Mon Sep 23, 2013, 7:13 pm

Tenant Improvement as an EBOM Facility Alteration

EBOM-2009 MRc9:Solid waste management - facility alterations and additions
posted by  Andrew Carman  on 

Does a Tenant Improvement (payed for by the tenant, not the building owner) count as a facility alteration under EBOM?

1
Fri Sep 27, 2013, 4:19 pm

the fan power of mechanical ventilation

CS-2009 EAp2:Minimum energy performance
posted by  tiantian zhou  on 

Dear sir/madam, Per the Revised Section 1 4 Tables (Dec 2012), for Systems 9 and 10,the fan power=0.3*supply air flow rate(cfm).

1
Wed Oct 9, 2013, 8:31 pm

Selection baseline cooling system for industry process

NC-2009 EAp2:Minimum energy performance
posted by  Roberto Oshiro Gama  on 

I am trying to select the baseline cooling system of a food industry.

1
Tue Sep 24, 2013, 2:42 pm

Continuous Education Video

Schools-2009 IDc3:The school as a teaching tool
posted by  PAULA HIDALGO  on 

I'm working on a university campus project and for the university is very difficult to implement or change its courses, specially because the building I'm working with contains classrooms that will

1
Tue Nov 5, 2013, 12:08 am

Total number of parking spaces

NC-2009 PIf2:Project Summary Details
posted by  Erin Nuckols  on 

Hello, I am working on a museum project with an existing building that is not a part of the scope.

1
Sun Sep 29, 2013, 4:41 pm