Forum quick links
Can gas metering only qualify for EAc3.2?
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by James Doyle on
Under LEED EBOM 2009 I am considering attempting metering under credit EAc3.2 for a 200,000 sq. ft.
Residential Kitchen Equipment
Healthcare-v2009 WEc4.3:Water use reduction - food waste systemsposted by Rosemary Ziemann on
If the project is using residential grade kitchen equipment (this is for a licensed Nursing Home) - therefore we do not have a food waste disposer systems or pulpers, extractors, etc.
Systems Manual for Enhanced Commissioning
NC-2009 EAc3:Enhanced commissioningposted by Tom Nichols on
We received a comment that we need to include system single-line diagrams in our systems manual. Can anyone clarify what the GBCI wants?
Option 2 documentation?
NC-2009 MRc5:Regional materialsposted by Erica Downs on
Has anyone received any feedback yet on Option 2 documentation?
Purchase of Used Furniture
posted by Gavin Simone on
Can the purchase of used furniture be used towards this credit? Are there any restrictions?
Designated Storage Area(s)
NC-2009 MRp1:Storage and collection of recyclablesposted by Julia Ellrod on
Could someone please clarify the following for me?
Dual Flush Toilets
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by LUCY WILLIAMS on
We have a project registered with LEED-EB O&M 2009. There are dual flush toilets in the facility.
Loose Furniture and Systems Furniture - Textiles/Upholsteries
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Becky Baumer on
My interpretation of this credit is that all upholsteries/textiles that are applied to loose furniture and systems furniture are included in this credit as well.
Site plan diagram for shading
Healthcare-v2009 SSc7.1:Heat island effect - nonroofposted by Michael Brown on
If we are trying to get Option 1 Site Hardscape. A combination of shading, high reflectance, and/ or open grid paving is provided for at least 50% of the site hardscape.
Required submittals of EAp2 contain same details
CS-2009 EAp2:Minimum energy performanceposted by tiantian zhou on
Dear sir/madam, For the submittal of credit EAp2, the revised Section 1 4 Tables have included all the input parmeters,should we still submit the input summary files?