Forum quick links
Area calculation for trees
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Muhammad Faisal Azizullah Jaffar on
I have a project where trees, shrubs and groundcovers will be used. While the area coverage of shrubs and groundcovers is relatively easy to calculate, trees are a bit more tricky.
Calculating materials costs to achieve MR credits
NC-2009 MRc3:Materials reuseposted by Remigio Antonio Rancan on
Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.
N, Qunit (tons) and Refrigerant Charge (Rc) in lb/ton
NC-2009 EAc4:Enhanced refrigerant managementposted by Adi Negara, LEED AP BD+C on
Dear All, I'm trying to fill the EAc4 form, but I don't understand about HVAC&R at all. I'm not too sure what is N, Q and Rc column meaning.
Can gas metering only qualify for EAc3.2?
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by James Doyle on
Under LEED EBOM 2009 I am considering attempting metering under credit EAc3.2 for a 200,000 sq. ft.
Residential Kitchen Equipment
Healthcare-v2009 WEc4.3:Water use reduction - food waste systemsposted by Rosemary Ziemann on
If the project is using residential grade kitchen equipment (this is for a licensed Nursing Home) - therefore we do not have a food waste disposer systems or pulpers, extractors, etc.
Systems Manual for Enhanced Commissioning
NC-2009 EAc3:Enhanced commissioningposted by Tom Nichols on
We received a comment that we need to include system single-line diagrams in our systems manual. Can anyone clarify what the GBCI wants?
Option 2 documentation?
NC-2009 MRc5:Regional materialsposted by Erica Downs on
Has anyone received any feedback yet on Option 2 documentation?
Purchase of Used Furniture
posted by Gavin Simone on
Can the purchase of used furniture be used towards this credit? Are there any restrictions?
Designated Storage Area(s)
NC-2009 MRp1:Storage and collection of recyclablesposted by Julia Ellrod on
Could someone please clarify the following for me?
Dual Flush Toilets
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by LUCY WILLIAMS on
We have a project registered with LEED-EB O&M 2009. There are dual flush toilets in the facility.