Forum quick links
How to claim savings for Equipment Power Density in LEED project
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by J I on
Currently I'm working on a commercial building compliance modeling for LEED CS program.
Faucets with Sensors
NC-2009 WEp1:Water use reductionposted by J Douglas Dietrich on
If we are installing low-flow faucets with vandal-proof aerators and sensors such that the water flow stops when a user's hands are not near the faucet, how should we account for that in the LEED t
Surfaces
Pilot-Credits EQpc22:Interior lighting - qualityposted by William Kelly on
We are appling for PC22 Lighting Quality. Regarding the requirements of Strategy E and Strategy F, what are the surfaces that are to be documented?
10% exclusion of square footage "defined" for EBOM credits
NC-2009 PIf2:Project Summary Detailsposted by Wendy Parker, LEED AP on
Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?
four IEQc3.2 questions....
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Carrie Laurendine on
1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).
LEED-NC 2009 with a future tenant space
CS-2009 SSc9:Tenant design and construction guidelinesposted by Derek Breuninger on
Our building project has a very small future tenant space.
can partial credit be earned?
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Becky Dix on
Our project is an expansion to a facility that hosts events/conferences in addition to its normal use as a lab facility, and while daily use would not require all the parking necessary by code, the
Acrylic enamel/lacquer in aerosol, non-flat
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Alicia Villanueva on
Good afternoon, does anyone know the VOC allowance for an acrylic enamel/lacquer in aerosol, non-flat? I do not know in which product type does this product falls into to take the VOC limit. Thank
Automatic controls required?
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Nicole Kimoto on
I have a project that has a shop areas where building occupants will be working. It is very important that the light not turn off automatically when they are working.
Documentation of Comingled Waste
CS-2009 MRc2:Construction waste managementposted by Panupant Phapant on
If on site have some commingled waste , LEED Online form require us to provide supporting document. I wondering that what kind of this document? and What the topic are will involve in this?