Forum quick links
European Testing Laboratories
NC-2009 SSc7.2:Heat island effect - roofposted by Jaida Anderson-Lozano on
I had become frustrated with the lack of a database of European testing laboratories so I created my own.
Drawings
NC-2009 SSp1:Construction activity pollution preventionposted by Courtney Royal on
Is it acceptable to just upload a drawing with the erosion and sedimentation control measures or is it required to have an actual ESC plan as well?
Commissioning on Multi-Family Building (Residential)
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Saju Varghese on
How does the commissioning process work on a multifamily residential building? Does each residential unit have to be checked? or is it just the a certain number of them?
Exhaust and Outdoor Air
NC-2009 EAc1:Optimize energy performanceposted by Ramana Koti on
Dear All, We're working on the certification of a restaurant where the kitchen has an outdoor air (OA) rate of 2350 CFM, supply air at 8000 CFM, and an exhaust rate of 3675 CFM.
Documentation
NC-2009 MRc7:Certified woodposted by Caroline O'Leary on
I just looked through the comments/questions for a few pages and didn't see this question.
What is the baseline flow rate for Jacuzzi?
NC-2009 WEp1:Water use reductionposted by Karina Kuan on
Hi!! My project is planning to use Jacuzzi as one of the sanitary fitting in the master room.
Temporary Parking Question
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Todd Bundren on
My project is a group project on a college campus with 2 phases. We are going to be certifying each phase separately.
GHG Emissions in Pilot Credit EAC27
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Arda Moltay on
Pilot Credit EApc27 requires the eventual MV evaluation report to include an evaluation of: "Avoided GHG emissions compared to the EA Credit 1 baseline." We're doing a CS2009 project and we have n
Housekeeping exhaust rate
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Michela Tedeschi on
We are developing a building which has a cleaning storage rooms and all the cleaning products are closed/sealed except for temporary use (1 use per day). We want to persue the Ashrae 62.1-2007 by u
Distance measurement submission
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Magda Aghababyan on
Hi, In the submission LEED asks to submit a site plan to scale with the walking path marked on it.