Forum quick links
Nature Trail
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Marissa Hebert on
If you use a universal access nature trail as part of your Places of Respite, does the trail have to provide shaded seating?
Simulation approach strategy.
CI-2009 EAc1.3:Optimize energy performance - HVACposted by TOMAS URIBE on
Hello Marcus. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.
ASHRAE 90.1-2007 - 6.4.3.1.1 COMPLIANCE CRITERIA
CI-2009 EAp2:Minimum energy performanceposted by RICARDO HERNANDEZ on
Does anyone know how stringent is the criteria to achieve compliance with the 6.4.3.1.1 Zone Thermostatic Controls for a Commercial Interiors?
Redrawing Project Boundary AFTER Initial Review
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by C.M. G. on
Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.
Where are the Import Facility Data Templates?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Lewis Hewton on
Can somebody please direct me where to find the 'import facility data' templates on the Energy Star website?
Utility tariff - an accepted DR strategy?
Data-Centers-NC-v4 EAc4:Demand responseposted by H.K.C.B. Heendeniya on
Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.
Naturally Ventilated Underbuilding Parking Garage and 62.1
NC-2009 EAp2:Minimum energy performanceposted by Jean Marais on
62.1 has an exahust requirement for mechanically ventilated Parking garages (Table 6-4), with an exception C - no ventilation required if two or more sides comprise walls that are at least 50% open
Tenant submetered water use in CS scope?
NC-2009 WEp1:Water use reductionposted by Jukka Akselin on
In our shopping mall CS project the all water fixtures in tenant spaces are controlled by tenants (shops + restaurants) and the owner has no control over the fixtures.
Commissioning Agent Qualifications
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Rick Alfandre on
Qualifications for CxA state they must have documented commissioning authority on at least 2 building projects. Is there any commissioning authority experience outside of LEED CxA experience tha
Adjustable shower head
NC-2009 WEp1:Water use reductionposted by Nelina Loiselle on
We received a reviewer comment saying since we had an adjustable shower head we would have to assume the highest gpm setting.