Redrawing Project Boundary AFTER Initial Review

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  C.M. G.  on 

Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.

1
Mon Dec 23, 2013, 7:31 pm

Where are the Import Facility Data Templates?

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Lewis Hewton  on 

Can somebody please direct me where to find the 'import facility data' templates on the Energy Star website?

1
Thu Dec 12, 2013, 11:07 pm

Utility tariff - an accepted DR strategy?

Data-Centers-NC-v4 EAc4:Demand response
posted by  H.K.C.B. Heendeniya  on 

Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.

1
Fri Dec 13, 2013, 2:17 pm

Naturally Ventilated Underbuilding Parking Garage and 62.1

NC-2009 EAp2:Minimum energy performance
posted by  Jean Marais  on 

62.1 has an exahust requirement for mechanically ventilated Parking garages (Table 6-4), with an exception C - no ventilation required if two or more sides comprise walls that are at least 50% open

0

Tenant submetered water use in CS scope?

NC-2009 WEp1:Water use reduction
posted by  Jukka Akselin  on 

In our shopping mall CS project the all water fixtures in tenant spaces are controlled by tenants (shops + restaurants) and the owner has no control over the fixtures.

1
Fri Dec 20, 2013, 9:29 pm

Commissioning Agent Qualifications

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Rick Alfandre  on 

Qualifications for CxA state they must have documented commissioning authority on at least 2 building projects. Is there any commissioning authority experience outside of LEED CxA experience tha

1
Fri Dec 13, 2013, 5:19 pm

Adjustable shower head

NC-2009 WEp1:Water use reduction
posted by  Nelina Loiselle  on 

We received a reviewer comment saying since we had an adjustable shower head we would have to assume the highest gpm setting.

1
Fri Dec 20, 2013, 9:25 pm

LEED Online IEQc7.1-2

CI-2009 IEQc7.1:Thermal comfort - design
posted by  Kasandra Martin  on 

It asks to upload--"Upload IEQc7.1-2. Provide supporting documentation.

1
Thu Dec 31, 2015, 10:27 pm

LEED -NC 2009 for Retail, MRp1

Retail-NC-v2009 MRp1:Storage and collection of recyclables
posted by  SHEILA MORALES  on 

If we have a (supermarket) store in a remote location that is not within the service area of an organic waste recycler (such as a commercial composter), and organic waste is shown by a waste estima

1
Tue Feb 4, 2014, 10:33 pm

Review comments on widow U-value

NC-2009 EAp2:Minimum energy performance
posted by  Chris Miller  on 

We received the following review comments during our design review and my question is, where do I find the Uvalue for the frame & glass assembly mentioned in their comments(this is a storefront

1
Fri Dec 13, 2013, 10:15 pm