Forum quick links
combining SSc7.1 and 7.2
CS-2009 SSc7.1:Heat island effect - nonroofposted by Alfonzo Collins on
I am working on a commercial building with an underground parking lot. 100% of all parking spaces are in this lot.
baseline HVAC system selection
CS-2009 EAp2:Minimum energy performanceposted by Agnieszka Rylska on
I would like to clarify the basis of baseline HVAC system selection in energy modeling. Selection is based, among others, on number of floors and conditioned floor area.
EBOM v4 VS EBOM v2009
NC-2009 PIf1:Minimum Program Requirementsposted by DAVIDE FILIPPI on
Hey everyone! I'm new here. I'm an italian student of a Master, and I'm starting to study Leed for EBOM. I don't have the reference guide of this rating system, I hope it will arrive soon.
Hazardous Gases or Chemical Exhaust
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Stephen DeGrazio on
What is meant by "Average Differential Pressure"? In my case, i have 4 janitor's closets and a recycling room on the same fan.
Option 1 with no dedicated smoking areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Annalise Reichert on
I am working on a project that has installed signage near major entrances that prohibits smoking within 25 feet of all doors and windows.
Allocating Green-e Certified power to EAc2 and EA6
NC-2009 EAc2:On-site renewable energyposted by Adam Prince on
We have a LEED NC project in Massachusetts (Office space with 2 residential units above). On the roof will be a PV system producing just over 50% of the buildings total energy consumption.
USGBC-approved wood certification schemes
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jane Wigren on
Where can I find a list over USGBC-approved wood certification schemes? I am especially interested in those found outside of the United States.
Equation 1. Volume of Captured Runoff
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Ahmed Mosa on
Why is equation 1 divided by 12" ? Vr=(P.Rv.A)/12"
On Site Renewable Energy accreditation
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Alicia Villanueva on
We are working in a project where the local government wants to certify its main administrative office building. They want to install PV panels but they no longer have available space on this buil
Does no response mean satisfied?
EBOM-2009 IEQc2.1:Occupant comfort - occupant surveyposted by Victoria Bauer on
My questions for the Building Appearance section do not include point scale.