Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Undeveloped vs. Greenfield

CS-2009 SSc5.1:Site development - protect or restore habitat
posted by  Michelle Rosenberger  on 

One of our warehouse projects is the fifth phase of an existing development.

1
Tue Jan 28, 2014, 6:07 pm

CO2 sensors in duct work

Schools-2009 IEQc1:Outdoor air delivery monitoring
posted by  Todd Bundren  on 

The mechanical engineer who designed our heating / cooling system placed the CO2 sensors for the gymnasium (with bleachers) in the return ducts.

1
Wed Jan 8, 2014, 10:08 pm

Baseline of NPDc8

ND-v2009 NPDc8:Transportation demand management
posted by  Jie Xiong  on 

Hi For this credit, it says that create a TDM program for the project to reduce 20% at least weekday peak-period motor vehicle trips compared with a baseline case. So what is the baseline case?

1
Fri Jan 10, 2014, 4:06 pm

Exemplary Performance

CI-2009 SSc3.1:Alternative transportation - public transportation access
posted by  Wayne DeFeo  on 

On the form it notes that for exemplary performance we have to show that we are within 1/2 mile of at least 2 existing commuter rail, etc….and/or within 1/4 mile of at least 2 stops for 4 or more…b

0

Clarification on SS Credit 5.2

CS-2009 SSc5.2:Site development - maximize open space
posted by  Emmanuel Gee  on 

Our project is in a dense urban area and we will meet the guidelines for SS Credit 2.

1
Thu Jan 9, 2014, 7:01 pm

Eucalyptus - Rapidly Renewable

CI-2009 MRc6:Rapidly renewable materials
posted by  Vivian Tazima  on 

Hi, I have a project that uses MDF for furniture manufacturing. Here in Brazil the MDF are 100% virgin materials - derived from the eucalyptus reforestation. There are studies showing that the euca

1
Fri Mar 7, 2014, 5:05 pm

Pre construction ductwork cleaning

NC-2009 IDc1:Innovation in design
posted by  Cynthia Kaplan  on 

My project is a full renovation of a 1920's high school for use as a new middle school. The owner ordered a full video inspection of the existing ductwork.

1
Thu Jan 9, 2014, 8:34 pm

Applying the 0.5 gpm limit to toilets embedded in departments

Healthcare-v2009 WEp1:Water use reduction
posted by  Kim Shinn  on 

There is a discussion string under the LEED HC 2009 WEc3 credit forum about whether or not faucets in toilet rooms that are embedded in clinical departments (imaging, lab, therapy) should or should

0

Bicycle Facilities credit - required bike lane width

NC-v4 LTc6:Bicycle facilities
posted by  Michelle Bombeck  on 

Does anyone have any insight into the on-street bike lane width requirements for this credit?

1
Thu Jan 9, 2014, 8:31 pm

Interior Renovation

CI-2009 MRc1.2:Building reuse - maintain interior nonstructural elements
posted by  Jeremy Kuhre  on 

I'm seeking clarification on how this credit applies to an interior renovation. The existing tenant will actually remain in place during construction.

1
Fri Apr 25, 2014, 4:42 pm