Forum quick links
Recertification - Changed Cleaning Contractors
EBOM-2009 IEQc3.4:Green cleaning - sustainable cleaning equipmentposted by Greengrade User on
For a recertification, if the building management switches cleaning contractors partway through the performance period, and now completely different cleaning equipment is being used at the building
Blue Roof
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Jamison Hill on
As part of NYC's blue roof requirement, roofs must provide 24 hour detention detention for the 2-yr design storm and an equivalent peak runoff rate equal to a curve # of approx 50 for projects disc
Core and Shell minimum occupancy
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by Vada Kornegay on
It seems clear but, to be certain, can a core and shell project have an occupancy of less than 50%?
What shell I do?
EBOM-2009 MRc7:Solid waste management - ongoing consumablesposted by Taygun Yüksel on
Hi there, I would like to ask a question about this credit scope. We have EBOM Coca Cola factory project in Turkey.
Facade lighting for advertising
CS-2009 EAp2:Minimum energy performanceposted by Lolita Wu on
We have a question about facade lighting for a retail project. As the mandatory requirement, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface.
Typo in the Bird's eye view: 10 fc - not 25 fc?
EBOM-2009 IEQc2.4:Daylight and viewsposted by Diana Nezamutinova on
Isn't the requirement for daylight to have 10 fc, not 25 fc as stated in the EBOM IEQc2.4 Bird's view? Thank you.
Tenant switch in a EBOM certified building
CI-2009 PIf5:Previously LEED Certified Detailsposted by Mathilda Jonsson on
Hi all My project is LEED EBOM certified since 2010. In summer the current tenant are moving out and a new one will move in.
Ceramic tiles vs FloreScore
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Catharina B on
Hi I’m a little bit confusing, please correct me. On my LEED CS v2009 ceramic tiles, stone and resin will be installed part of the CS scope of works.
Legacy LEED AP
Healthcare-v4 INc2:LEED Accredited Professionalposted by Catherine Blakemore on
Can folks with Legacy LEED AP status be the LEED AP for projects and fulfill the requirements of this credit?
Water Use Reduction points
NC-v4 WEp1:Outdoor water use reductionposted by UGC/GPRO Office Account on
Hi All, I am gathering all the water use reduction points in v4.