Forum quick links
multifamily building
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Courtney Royal on
If i have a multifamily building with a common laundry room and say the housekeeping supplies will be kept in a separate janitorial storage closet elsewhere in the building, do both of these spaces
Siting electric charging stations outside LEED boundary
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by GTF CPRE on
I'm working on a campus student union, with only a few parking spaces within the LEED boundary.
Furniture not included
CI-2009 MRc3.2:Materials reuse - furniture and furnishingsposted by Vada Kornegay on
I have a project where the furniture was not included in the base contract and the contractor therefore did not include it in the material costs for the project.
Automatically adjust dampers
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Magda Aghababyan on
Dear all, If the system can automatically adjust the dampers when the CO2 levels vary by +/-10% (instead of the alarm) will it be acceptable for the credit? Thank you.
Toolkits for v4
NC-v4 MRc1:Building life-cycle impact reductionposted by Linda Deatrick on
When will the toolkits with templates be on-line?
No new parking
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by Alfonzo Collins on
I'm working on a shopping center in an urban area. We're providing about 90 parking spaces, slightly more than code minimum, so we can't get the points using Option 1.
Sequence of Operations
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Martha Norbeck on
Hello LEEDuser forum, I am doing the documentation for a small building (4,500 sq. ft) with a small mechanical system.
new or aged R-value?
NC-2009 EAp2:Minimum energy performanceposted by Tristan Roberts on
This was posed in another spot on LEEDuser and I thought it was worth asking here. Is there a rule to use initial vs. long term R-values?
Building on a parking lot
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by American University on
We're constructing a multi-building project on a parking lot on our campus Though there will be a 150 spot parking garage under one of the buildings, this is a reduction from the surface parking th
Collaborative space within pods of workstations
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Joyce Kelly on
In the center of a pod of 8 workstations there are two breakout tables for collaborative work. Each workstation has a tasklight.