Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

HVAC Design Case Equivalent of VRF systems

NC-2009 EAc1:Optimize energy performance
posted by  Achelles DSouza  on 

I am working in an Office block project (conditioned area- 8500 sqft). VRF systems have been considered for it.

1
Sun Mar 16, 2014, 8:04 pm

Printers in open space

CI-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Mike D  on 

If a project space does have printer areas in the open plan office but those printers/copiers are low-use, are there any additional details we need to provide or should we just mention these printe

1
Thu May 15, 2014, 5:24 pm

Achieving this credit in a Shopping mall?

CS-2009 IEQc6:Controllability of systems - thermal comfort
posted by  Maya Karkour  on 

Dear Sirs, We have a mall seeking LEED C&S 2009. Most of the spaces will be tenanted.

1
Tue Sep 20, 2016, 4:12 pm

Community Connectivity travel distance

NC-2009 SSc2:Development density and community connectivity
posted by  Jennifer Rennick  on 

I am documenting basic services within a 1/2 mile radius of a project, however within the radius is a large body of water (river port).

0

Employee Garden for IO Point?

EBOM-2009 IOc1:Innovation in operations
posted by  LUCY WILLIAMS  on 

Hi All, Has anyone had success crafting an innovation credit around an employee garden? We have a portion of our site dedicated to an organic employee garden.

1
Wed Apr 30, 2014, 3:14 pm

Partial Existing Envelope

NC-2009 EAc1:Optimize energy performance
posted by  Clint Whitney  on 

I'm performing an energy model that is a renovation of an existing structure. The existing structure has a sheet metal roof, two vertical sheet metal walls, and 4" concrete slab.

1
Mon Mar 17, 2014, 9:18 pm

IEQ 4.4 and MR 7

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Al Shadid  on 

Can We have wooden doors that qualify for both IEQ 4.4 and MR 7? Can you have FSC wooden doors that contain no added urea formaldehyde?

1
Tue Mar 18, 2014, 6:18 pm

MR7 AND IEQ 4.4

NC-2009 MRc7:Certified wood
posted by  Al Shadid  on 

Can We have wooden doors that qualify for both IEQ 4.4 and MR 7? Can you have FSC wooden doors that contain no added urea formaldehyde?

1
Tue Mar 18, 2014, 11:22 am

Carpool discount

CI-2009 SSc3.3:Alternative transportation - parking availability
posted by  BEE Incorporations  on 

We are working on a LEED CI office project located in a dense urban center with the minimum parking dedicated for the building.

1
Sat Jul 26, 2014, 5:24 am

5 degree deadband

NC-2009 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

How is ASHRAE 6.4.3.1.2 5 degree deadband interpreted? 70-75 deadband provides six temperatures in which the thermostat is "dead".

1
Tue Mar 25, 2014, 3:22 pm