Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

IEQ 4.4 - URGENT

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Al Shadid  on 

All of our adhesives contain no added urea formaldehyde, however our wooden doors contain the following:

1
Mon Mar 10, 2014, 2:42 pm

24-hour lighting

NC-2009 EAp2:Minimum energy performance
posted by  Bill Swanson  on 

I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.

1
Mon Mar 10, 2014, 7:05 pm

Loading Dock

EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source control
posted by  David Wood  on 

I had a question in regards to loading dock.

1
Tue Mar 11, 2014, 5:47 pm

LPB for underground parking area shared between several projects

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kent Liu  on 

I am currently defining LPB for 3 different LEED projects under the same developer.

1
Tue Mar 11, 2014, 2:59 am

Qualification for LEED CS vs. NC

ND-v2009 PIf1:Development Program and Site Type
posted by  Jin Yang  on 

Hi Eliot, The master planning project consists of two parcels with three highrise buildings.

0

is this clarification ok?

NC-2009 EAp2:Minimum energy performance
posted by  Shenhao Li  on 

automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the en

1
Tue Mar 11, 2014, 2:48 pm

Natural landscape to recover on site

NC-2009 WEc1:Water efficient landscaping
posted by  Luis Huertas  on 

Our project is going to allow the natural landscape to return to the landscape areas of the project. Can I claim no potable use and achieve the credit using this strategy?

1
Tue Mar 11, 2014, 1:54 pm

Section 11 or Appendix G?

CI-2009 EAp2:Minimum energy performance
posted by  Steve Gross  on 

Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language.

1
Tue Mar 11, 2014, 6:43 pm

CFL compliance

Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lamps
posted by  Gustavo De las Heras Izquierdo  on 

I am checking a compact florescent lamps compliance (integral ballast, bare bulb), which should be 10,000 rated hours according to the credit table. The CFL cut-sheet I've been provided with state

1
Wed Mar 12, 2014, 12:19 am

LEED Project Boundary for a Transit Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kimberlyn Caoagas  on 

BACKGROUND INFO: - Attempting LEED EB: O&M Certification for a historical train/transit station - The first floor of the station has an opening/threshold (no enclosures) that connects to an u

0