EPD of imported Products and Materials
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by María Fernanda Aguirre on
Here in Chile, currently we do not have many products with EPD or running LCA (we are on our way and moving fast to do so), thus, many of the products having EPD (specific and generic) are imported
Mixed Use Building Residential + Commercial
NC-2009 EAc5:Measurement and verificationposted by Saju Varghese on
We are working in a project for which we will be pursuing LEED NCv2009. It is a mixed use (residential and commercial) building.
Measurement at DOAS before fixed dampers
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Noriko Nagazumi on
From the reference guide: "Show compliance with the applicable requirement above through measurements taken at the system level (i.e., the air-handling unit).
ASHRAE and voltage drop
CS-2009 EAp2:Minimum energy performanceposted by BH . on
ASHRAE puts a requirement to keep in electrical services on the feeders max 2% voltage drop and on the branch circuits max 3%.
Spot Metering for CI 2009 EAc3 Option B
CI-2009 EAc3:Measurement and verificationposted by Michael Hill on
I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.
purchasing merchandise for resale
EBOM-2009 IOc1:Innovation in operationsposted by ethan adams on
We are a non-profit org. with a modest, but growing, merchandise sales program.
CAMPUS Approach For Rainwater Management
EBOM-v4 SSc2:Rainwater managementposted by Patricia Andrasik on
I am currently analyzing and attempting to achieve the Campus credit for Rainwater Management for a university that is projected to change in the following 5-10 years.
Carpet over asbestos tile
NC-2009 MRc2:Construction waste managementposted by PATRICK HILLIER on
As part of the owners precronstuction abatement flooring adhered to hazardous floor tile was removed by an abatement contractor.
Apply to LEED Committees by April 10
Pilot-Credits LTpc70:Green vehiclesposted by Christopher Law on
Hi experts, Wanted to notify those subscribed to this forum of the ongoing LEED Committee Call for Volunteers. This opportunity is open until next Thursday, April 10th at 8:00 pm EST.
USGBC Approved equivalent standards
NC-2009 EAc1:Optimize energy performanceposted by Mike D on
The guide allows to use a USGBC approved equivalent standard for projects outside the US. Where can this list of approved standards be found?