Construction within LEED boundary after completion of original

NC-2009 PIf2:Project Summary Details
posted by  Heather DeGrella  on 

Our project that has been submitted for certification was completed in early 2012. The project was built exactly as it was submitted for the LEED review.

1
Wed Apr 23, 2014, 5:21 pm

Project In Dubai.

NC-2009 SSp1:Construction activity pollution prevention
posted by  Samer Alhmdan  on 

we have got a project in Dubai, the site witnesses very nominal rainfall in a year (average

1
Tue Apr 15, 2014, 11:45 am

Skylight coverage

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Adrienn Gelesz  on 

Hi, in case of a not meeting the skylight coverage ratio of 3-6% for the total room space, e.g.

1
Tue Apr 22, 2014, 8:29 pm

Alternate Compliance Concept - Thoughts?

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Eric Thompson  on 

We have a situation where our site only has one bus line with a stop within 1/4 mile (though 2 other stops are within 1/2 mile). However, the one bus line is very frequent and runs all day.

1
Thu May 29, 2014, 10:35 pm

Wood Cladding adhesives

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Nouran Abdel-Rahman  on 

We are applying wood cladding for the walls. To assign the cladding panels, firstly we apply wood framing to the walls then fasten the panels to them.

1
Thu Apr 17, 2014, 2:04 pm

Window Frames and Window Area

Schools-2009 IEQc8.1:Daylight and views - daylight
posted by  Larry Turbes  on 

Does LEED's "window area" take into account framing or is "window area" the actual glass area (excluding framing)?

1
Thu Apr 17, 2014, 1:46 pm

Minimum Indoor Air Quality Calculation (Natural Ventilation)

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  JP Rout  on 

We are pursuing for Fresh Air calculations for a Building with Natural Ventilation, as per the ASHRAE 62.1-2007 requirement, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Perform

1
Thu Apr 17, 2014, 3:01 pm

Building Reuse off Site

Schools-2009 MRc1.1:Building reuse - maintain existing walls, floors and roof
posted by  Larry Turbes  on 

Our project has two building structures that will be moved for use on another property by a different owner. One is a greenhouse, the other is a prefabricated temporary classroom building.

1
Thu Apr 17, 2014, 5:11 pm

EP Threshold for LEED-HC

NC-2009 EAc6:Green power
posted by  Paul Diaz  on 

The reference guide does not provide an EP threshold for this credit under the LEED-HC system. Does anyone know if an EP point is available at 70% or 100%?

1
Mon May 19, 2014, 6:58 pm

Illustrating Compliance using representative sampling?

EBOM-2009 IEQc2.2:Controllability of systems - lighting
posted by  Ryan Hoffman  on 

All, We are working with a client in a 1.2 mill. SF office building with three towers connected by a central core.

1
Mon Aug 10, 2015, 6:48 pm