Forum quick links
Alcoholic beverages
EBOM-2009 MRc5:Sustainable purchasing - foodposted by Emmanuel Pauwels on
Does food and beverages include alcoholic beverages as well or only soft drinks and water?
Include or Exclude a classroom auditorium
NC-2009 IEQc8.1:Daylight and views - daylightposted by Ashonta Langdon on
We are doing an addition to a classroom building on a college campus. A ~100 seat auditorium style classroom makes up about 25% of the regularly occupied space of the building.
Soil Materials, Site work costs contribute to total cost?
NC-2009 MRc4:Recycled contentposted by Matthew Martin on
Should I include loads of soil, stone, pipe bedding materials, underground pipe, catch basins or other site work materials to the total cost of materials?
Qualifying spaces must meet IEQ c5
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by yanghee pierce on
SS c9.2 says 'Qualifying spaces must meet the requirements for outdoor air quality enumerated in IEQ c5.’ Does this mean a project has to meet IEQ c5 in order to achieve SS c9.2?
Building Metering and Utility Metering
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Becky Dix on
On a higher ed project, there is proposed metering of all energy and water usage for the LEED building that can be read from the building automation system.
Eucalyptus as a renewable material
NC-2009 MRc6:Rapidly renewable materialsposted by Heather Appell on
We are working on a project that removed the existing invasive eucalyptus trees on site and used them towards the structure of the project.
LEED v4 and Pilot Credit Requirements
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Chloe Bendistis on
I recently completed this Pilot Credit and determined that our project meets Option 1 and possibly meets Option 2.
Recycled content " Broadloom Carpet"
CI-2009 MRc4:Recycled contentposted by michael giannini on
The question i have pertains to the way information is placed on manufacturers websites and the validity of the information posted.
International Projects Regional Credits
EBOM-v4 RPc1:Regional priorityposted by Luis Huertas on
Anyone knows where I can get the list of the regional credits for international projects? I am evaluating a project in Aruba. Thanks.
Resort in remote area
ND-v2009 PIf3:Project Location and Base Mappingposted by Racha Rachwan on
Dear all, i'm studying a large resort project that aims to be LEED certified under ND, the problem that here in Egypt the government encourage and support to have the resort area or new communitie