Calculating Bike Storage for a Higher Education Student Dorm
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Clara Simon on
Please clarify the formula for calculating bike storage for a university student dormitory.
Utility Trenches OK Beyond Boundary?
Schools-2009 MPR3:Must use a reasonable site boundaryposted by Larry Turbes on
Are utility trenches such as sanitary service lines required to be within the Project Boundary?
When your manufacturer doesnt have SRI values
NC-2009 SSc7.2:Heat island effect - roofposted by Erin D. on
In regards to this credit the LEED REFERENCE GUIDE FOR BUILDING DESIGN & CONSTRUCTION WITH GLOBAL ALTERNATIVE COMPLIANCE PATHS for LEED 2009 says that "Projects outside the U.S.
Chiller Minimum Equipment Efficiency nonstandard conditions
NC-2009 EAp2:Minimum energy performanceposted by Adriana Hansen on
The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions. It has been sent an AHRI certificate showing the compliance with ASHREA 90.1-2007 and 2010.
Blinds
CI-2009 IEQc8.2:Daylight and views - viewsposted by Mike D on
If blinds are installed, are the views calculations affected?
Zero-Waste program vs separate programs for food and e-waste
NC-2009 IDc1:Innovation in designposted by Susan Di Giulio on
Hi, We are working with some great clients in a city anxious to test-drive a zero-waste program. We have 2 CI-2009 projects with these clients.
Initial Questions about LEED O+M
EBOM-2009 PIf3:Occupant and Usage Dataposted by S. M. on
Hi all, We got a request from a building owner recently.
Commissioning with Volume Build Projects
Retail-CI-v4 EAp1:Fundamental commissioning and verificationposted by Robin Dukelow on
I am in the process of verifying the Cx requirements for Volume Build Projects.
Buried crushed concrete
NC-2009 MRc3:Materials reuseposted by Maria Isabel Conde on
We are demolishing an existing building. The team is considering burying the concrete, without this being used as fill for the new building. Could this account for the MRC2? Thanks,
SSc8 and EAc1 Disconnect?
Schools-2009 EAc1:Optimize energy performanceposted by Amalia Hicks on
For LEED v3 (2009) SSc8 - Light Pollution Reduction, the baseline exterior lighting power allowance uses ASHRAE 90.1-2007 Addendum i (which has similar values to 90.1-2010).