Forum quick links
Landscape Architect Statement template
ND-v2009 NPDc14:Tree-lined and shaded streetsposted by Colin Inderwish on
I am looking for a letter template that checks all of the approprate boxes for the required registered Landscape Archtitect statement declaring: "the details and tree species are appropriate based
Question on commercial areas in a NC project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by LEED Pro Consultant on
We are working with a project that will be a Bus Station, and it includes a building for the operation (waiting hall, offices, tickets) and a building for the drivers´ resting rooms, both joined by
Fundamental Refrigerant Management: Leed v4- Campus Credit
EBOM-v4 EAp4:Fundamental refrigerant managementposted by Patricia Andrasik on
We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.
Baseline for Ventilation Fan unconditioned space?
NC-2009 EAp2:Minimum energy performanceposted by Zonda E. Team on
What is the baseline for a ventilation fan providing outdoor air to an unconditioned space?
Solar Powered Task Lighting
CI-2009 IEQc6.1:Controllability of systems - lightingposted by Chris Brown on
Would Solar powered task lighting be acceptable for individual workstations in order to comply with this credit?
IEQ Prerequisite 1 – Minimum Indoor Air Quality Performance
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Harsharan Kaur on
We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Pe
copy paste
Retail-CI-v4 LTc5:Reduced parking footprintposted by manuel de jesus gonzalez duron on
this credit is the same has Access to quality transit
Energy Star's Portfolio Manager Tool
CS-2009 PIf1:Minimum Program Requirementsposted by Kathryn Van Nelson on
Who exactly registers a project with Energy Star's Portfolio Manager Tool?
Manufacturer Declaration
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Lilian Seow on
The tile contractor says they can't disclose their floor tile and stone supplier information.
parking rainwater
NC-2009 SSc6.2:Stormwater design - quality controlposted by jorge calderon on
For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the