Forum quick links
Invasive species removal service project
EBOM-2009 SSc5:Site development - protect or restore open habitatposted by AtSite Inc on
We are thinking of organizing an annual service project to remove invasive species in a nearby park to comply with SSc5.
e-cigarettes just like regular cigarettes
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Tristan Roberts on
USGBC has just issued a LEED Interpretation clarifying that e-cigarettes should be considered the same as conventional cigarettes for the purpose of this prerequisite.
Automatic shading to control glare
NC-2009 IEQc8.1:Daylight and views - daylightposted by ÅF Lighting on
To whom it may concern, We are involving a project going to be built in Uppsala, Sweden.
Wall base definition
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Jaida Anderson-Lozano on
The definition for "hard surface flooring - includes vinyl, linoleum, laminate flooring, wood flooring, rubber flooring, wall base, and associated sundries." (LEED Reference Guide, pg.492) This
LEED EB O&M Certification - optimized energy performance
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by satheesh M on
I want to register a project in LEED EB. my project contains 3 buildings in a 8 building campus.
Documentation for a single building in multi building campus
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by satheesh M on
we would like to pursue the LEED EB certification for 2 buildings in a multi building campus.
EP - Option 3
EBOM-v4 SSc3:Heat island reductionposted by Lorne Mlotek on
This option states achieve both EP options 1 and 2. How does this make sense. Are you able to earn more than one EP per credit.
Permanent furniture
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Pascal Genest-Richard on
We would like to know if it is possible to start the flush out (and maybe even finish it) before all permanent furniture is installed.
Documenting costs and cut sheets
NC-2009 MRc3:Materials reuseposted by John Covello on
Hello, Our project will be purchasing old teak wood (in good shape) from housing that is to be demolished. The invoices may be simple hand written pages noting the pricing and date.
Hi,
We have a project where
NC-2009 IEQc7.1:Thermal comfort - designposted by Mayank Bhatnagar on
Hi, We have a project where design mandates space usage as manufacturing facility with met rates of 2.2, clo values of 0.6 and air velocity of 120 ft/min or 0.6m/sec.