Forum quick links
Pot washing sink
NC-2009 WEp1:Water use reductionposted by Christine Harvey on
I saw a comment on this site that implied the water used for pot washing sinks and kitchen food prep sinks can be excluded from the calculations, can someone verify that for me?
Borrowing credits from other rating systems
CI-v4 INc1:Innovationposted by Breck Baird on
The Innovation credit guidance in the LEED reference guide says "points can also be earned by achieving selected credits from other LEED rating systems." And, on v2009 projects I have done this (i
Summary marked "N"
NC-2009 PIf3:Occupant and Usage Dataposted by Ryan Kurlbaum on
We have completed this form and for some reason continue to have the "summary" box marked as "N".
Editing Form Values
NC-2009 IEQc8.2:Daylight and views - viewsposted by Ryan Kurlbaum on
I have uploaded all the necessary documentation and made sure that the excel file "supplemental daylight and views" is properly filled out, however on the credit form the "total regularly occupied
NCv4 IEQc9 Acoustics - Hospitality
Hospitality-NC-v4 EQc9:Acoustic performanceposted by Tyra Sorensen on
Is there a more comprehensive list clarifying how spaces are classified?
occupied area
NC-2009 IEQc8.2:Daylight and views - viewsposted by ilkyaz ceren güçlü on
I'm working on a work center project which is located in Moskov, Russian Federation. I have a problem with area which is described as a regularly occupied area.
Well Building Standard
CI-2009 IDc1:Innovation in designposted by Susan Coy on
I am working on a LEED-CI project and we are doing documenting the project to receive the Well Building Standard certification as well.
Updated ACEE list of qualifying cars score >40
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Marisa Britton on
Tbe resources available through LEED User is outdated, it only shows the qualifying vehicles up through 2012. Here is the list through 2014.
Owned or leased?
NC-2009 PIf3:Occupant and Usage Dataposted by Gustavo De las Heras Izquierdo on
My project is a LEED NC 2009 building that is operated by a company different of the owner. I am just wondering if populating the PIf3 with "leased" will bring me problems during the review.
Commissioning Agent for project larger than 50,000sf
CS-2009 EAp1:Fundamental commissioning of building energy systemsposted by Katrina Chong on
We are pursuing both EAp2 and EAc3 for our v2009 C&S project.