Off-Site Option for Greenfield?

CS-2009 SSc5.1:Site development - protect or restore habitat
posted by  AtSite Inc  on 

If the site was previously a greenfield do you have the option to do off-site preservation of land to comply or is limiting the site disturbance the only option?

1
Wed Dec 24, 2014, 1:57 pm

Dual flush - average flow rate and fixture uses

NC-2009 WEp1:Water use reduction
posted by  Saju Varghese  on 

Looking at the Water Use Reduction - Additional Guidance in the section for Dual flush, they say: " For the female water closet usage, there is a 1:2 ratio in terms of number of full-flush to low-f

1
Mon Jan 5, 2015, 3:12 pm

"Determination of Ds Value for worst case scenario"

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Cyriac Joseph  on 

How do we calculate the Ds value for the condition where "The cooling load is low due to minimal envelope and internal loads but the number of occupants are at peak?" We have the following comment

0

Does mech engineer need to be PE to sign the "signature' box ?

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Matt Dem  on 

Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?

1
Mon Dec 29, 2014, 2:40 pm

Empty parking spots

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  S. Macgregor  on 

We are installing alternative-fuel refueling stations, with preferred parking.

1
Thu Jan 8, 2015, 4:56 pm

Water Efficiency Calculation

NC-2009 WEc3:Water use reduction
posted by  ABDUL MUTHALIB MOHAMED  on 

Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?

1
Mon Mar 2, 2015, 10:59 pm

Zero Lot Line calc

NC-v4 SSc4:Rainwater management
posted by  Janika McFeely  on 

Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?

1
Tue Apr 21, 2015, 6:03 pm

Third Party Review v4?

NC-v4 EAp2:Minimum energy performance
posted by  SBS Department  on 

Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?

1
Tue Jan 6, 2015, 3:01 pm

Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED

NC-2009 SSp1:Construction activity pollution prevention
posted by  Aly Adel  on 

Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).

1
Fri Nov 27, 2015, 3:46 am

educational strategy

NC-2009 IDc1:Innovation in design
posted by  jorge calderon  on 

Hi, we have a project that is an museum and auditorium with many educational components, as tour, video, activities, interactive web page, etc. Is it possible to obtain two ID credits for educatio

1
Tue Jan 6, 2015, 7:37 pm